Vadapalani is an elevated metro station on the South-East Corridor of the Green Line of Chennai Metro in Chennai, India. This station serves the neighbourhoods of Vadapalani and Kodambakkam and is one of the major stations on the Koyambedu-Alandur stretch and became operational by early 2015.
Construction history The station was constructed by Consolidated Constructed Consortium (CCCL). The consolidated cost of the station along with the stations of Koyambedu, Arumbakkam, CMBT, and Ashok Nagar was 1,395.4 million.
Yellow Line This metro station is proposed to be inaugurated by the honourable Prime Minister Narendra Modi along with the Chief Minister C. Joseph Vijay on October 11 2026, as part of the Phase 1 of Yellow Line.
The station The station is an elevated station at the junction of Jawaharlal Nehru Road and Arcot Road. At 16 metres above the street level, the station is the highest elevated station of the Chennai Metro.
According to CMRL, the station was projected to have at least 12,000 people passing through.
Station layout
GStreet LevelExit/EntranceL1MezzanineFare control, station agent, Metro Card vending machines, crossoverL2Side platform | Doors will open on the left Platform 2NorthboundTowards → Chennai CentralNext Station: ArumbakkamPlatform 1Southbound Towards ← St. Thomas MountNext Station: Ashok NagarSide platform | Doors will open on the left L3Side platform | Doors will open on the left Platform 3EastboundTowards → LighthouseNext Station: Kodambakkam PowerhousePlatform 4WestboundTowards ← Poonamallee Bypass **Next Station: SaligramamSide platform | Doors will open on the left L3Note:** (Further extension to in the future) Connectivity In 2014, Chennai Metro Rail Limited (CMRL) announced plans to connect Vadapalani Metro station with Forum Vijaya mall by means of a service road adjacent to the station.
Supportive infrastructure
As of 2013, about 11,000 vehicles pass through the section on Jawaharlal Nehru Salai between Kathipara and Vadapalani and 12,000 vehicles pass through the Vadapalani-Koyambedu section during peak hours. A total of 185,000 vehicles use the road every day.
Along with Koyambedu and Ashok Nagar Metro stations, Vadapalani Metro station will be developed by leasing out space either for shops or office spaces. As part of fire safety measures, underground water tanks of 50,000 to 100,000 litre capacity will be set up at the station.
The station will have an integrated flyover to bypass the junction. The 450-metre-long four-laned flyover will be built at a cost of 694.3 million and the central portion will be integrated with the Vadapalani Metro rail station. A separate bay will be constructed inside the station to enable MTC buses to drop and pick up passengers.
The flyover is being built jointly by the CMRL and the highways department.
See also
References
External links
UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.