The Shijiazhuang Metro (; branded as SJZ Metro) is the rapid transit system serving the city of Shijiazhuang, the capital of Hebei Province, China.
Network
LineTerminals(District or County) Commencement NewestExtension Lengthkm Stations Xiwang(Qiaoxi) Fuze(Zhengding) June 26, 2017 June 26, 2019 34.3 26 Liuxinzhuang(Chang'an) Jiahualu(Yuhua) August 26, 2020 — 15.5 15 Xisanzhuang(Xinhua) Lexiang(Gaocheng) June 26, 2017 April 6, 2021 26.7 22Total76.563
Annual urban-rail passenger volume reported for Shijiazhuang by CAMET. Values are passenger-trips in units of 10,000; reporting scope may include non-metro urban-rail modes and can vary by year.China Association of Metros, 2012 annual statistical report and 2025 annual statistical report. The linked Commons data pages identify the intervening annual reports and preserve their source URLs.
Raw passenger-volume data
Year-end urban-rail operating length reported for Shijiazhuang by CAMET, separating the metro series from the all-mode city total where both are reported.
Raw operating-length data
Line 1
Line 1 opened on 26 June 2017. It is 34.3 kilometers in length with 26 underground stations.
Line 2
Line 2 opened on 26 August 2020. It is 15.5 kilometers in length with 15 underground stations.
Line 3
Line 3 opened on 26 June 2017. It is 26.7 kilometers in length with 22 underground stations.
Background Planning and preparation for construction began in 2001 and 2008 respectively, but was delayed due to the world economic crisis. The projected was approved by National Development and Reform Commission and included in the urban rail development project 2012–2020. Construction of the first metro station at the Shijiazhuang railway station started in September 2012. Construction at other sites began on 14 May 2013.
Lines 1, 2 and 3 have, in total, 52 stations, 59.1 km length and will cost 42.19 billion yuan to construct. Phase 1 of Line 1, has 20 stations and is 23.9 km in length. Phase 2 of Line 1 has 8 stations and is 13.495 km in length. Only 6 stations in Phase 2, from Xiaohedadao to Fuze (10.4 km) are operational. Line 3, has 22 stations and is 26.7 km in length. Line 2, has 15 stations and is 15.5 km in length. It was opened on 26 August 2020.
Line 1 runs from west to east and then to the north of city. Line 3 runs from north-west to south-east and then eastwards. Each line intersects other two. Lines 1 and 3 intersects at Xinbaiguangchang. The stations of these two lines were named in January 2013. Line 2 runs from north to south.
Future development
There will be 63.6 km of new lines in the Phase 2 construction plan of Shijiazhuang Metro, including Line 1 (Phase 3), Line 4, Line 5 (Phase 1), Line 6 (Phase 1).
LineTerminals Lengthkm Stations Opening Reference (Phase 2 North section) Fuze Dongyang 3.1 2 2025 (Phase 3) Xiwang Huai'anlu 3.74 22027 (Phase 1) Yucunnanlu Dongyuandonglu 22.4 20 (Phase 1) Gongbeilu Tangubeidajie 19.9 19 2025 (Phase 1) Jianhuanandajie Dongzuolu 15.76 11 2027
Network map
References
External links Official site Shijiazhuang Metro on UrbanRail.net