Line 2 of the Hangzhou Metro () is a north-south rapid transit line, connecting the downtown with the districts of Xiaoshan and Yuhang in Hangzhou.
The first phase of the line, between and stations, entered operation on 24 November 2014 after six years of construction. It was extended to on 3 July 2017, and then to on 27 December in the same year.
During the day, Automatic Train Operation (ATO) is used on the line, which does not require train operators to control the speed of the train manually, however, every night between the hours of 20:30 and 22:30, operators are required to drive the train manually to ensure they still have the ability to drive the train manually in case of exceptional circumstances when ATO is not functional.Phone call with official office: 0571 5656 7007
Opening timeline SegmentCommencementLengthStation(s)Name Chaoyang — Qianjiang Road 24 November 2014 12 Phase 1 (southeastern section) Qianjiang Century City 28 April 2016 Infill station 1 Qianjiang Road — Gucui Road 3 July 2017 9 Phase 1 (northwestern section) Gucui Road — Liangzhu 27 December 2017 10 Phase 2 & 3 Xianing Bridge 30 June 2020 Infill station 1
Stations Station name Connections Location Xiaoshan ShangchengGongshuGongshu / XihuXihuGongshuYuhang
Rolling stock Stock Class Year built Builder Number built Numbers Formation Depots Line assigned Notes PM066 B 2013-2015 CSR Nanjing Puzhen 162 (27 sets) 02 001 - 02 027 (020011-020276) Tc+Mp+M+M+Mp+Tc Shushan DepotShuangqiao Yard PM098 2016-2017 CRRC Nanjing Puzhen 102 (17 sets) 02 028 - 02 044 (020281-020446) PM134 2018 12 (2 sets) 02 045 - 02 046 (020451-020466) PM138 2019-2020 120 (20 sets) 02 047 - 02 066 (020471-020666)
References