Line 2 of the Shenyang Metro () is a rapid transit line running from north to south Shenyang. It was opened on January 9, 2012 and is currently 45.58 km long with 33 stations.

Opening timeline SegmentCommencementLengthStation(s)Name Santaizi — Quanyunlu 9 January 2012 19 Phase 1 Hangkonghangtiandaxue — Santaizi 30 December 2013 3 Northern extension (1st section) Putianlu — Hangkonghangtiandaxue 8 April 2018 4 Northern extension (2nd section)Quanyunlu — Taoxianjichang29 September 20237Phase 2

Stations (north to south) station name Transfer Distance Location 0.000.00Shenbei1.121.121.552.671.013.681.435.111.306.41Yuhong2.408.81Huanggu2.0010.811.4512.260.8513.111.2514.360.9515.311.2516.56 SBT0.8517.41Shenhe0.8018.210.9019.111.3520.460.9021.361.2522.61Heping1.4524.06Shenhe0.9525.01 Tram Line 1/51.6026.61Hunnan Tram Line 11.3027.91 Tram Line 1/31.3529.26 Tram Line 1/31.4530.710.9031.61 Tram Line 1 Tram Line 1/3 Tram Line 1/3 Tram Line 3 Tram Line 3 SHE