Line 11 of the Beijing Subway () is a rapid transit line of the Beijing Subway. The line opened between and on December 31, 2021, and between and on December 30, 2023. Line 11's color is grapefruit.

Opening timeline SegmentCommencementLengthStation(s)Name Jin'anqiao — Shougang Park 31 December 2021 3 Phase 1 Moshikou — Jin'anqiao 30 December 2023 1

Stations Phase 1 All stations are in Shijingshan. Station NameConnectionsNearby Bus StopsDistance0.0000.000 1.3661.3660.8502.2160.6892.905

Phase 2 Under Planning. There are suggestions to add an infill station between Qingta and Lianhua Qiao stations on Phase 2 of Line 11. In July 2024, the infill station, Wanfeng Lu, was confirmed in official news. Distance: , all stations are underground. The planned new depot located in Shijingshan District, with all main buildings are underground. The total construction area is approximately 212,000 square meters, of which approximately 10,000 square meters are overground. The investment is approximately 3.29 billion RMB. Station NameConnectionsNearby Bus StopsDistance    Yamenkouxi (old)   (Branch) (U/C)                 BXP     (U/C)  

History Old planning In 2006, Line 11 was originally designed as an L-shaped line from Wanliu to Dahongmen, which together with the L-shaped Line 10, form a subway ring route.(Chinese) "北京再添三条地铁线 六号十一号线正岩土勘探" 北京青年报 2006-12-04 After Line 10 Phase II took over the entire ring route, Line 11 was displaced.

In January 2010, the government of Shijingshan District disclosed plans for a Line 11 in western Beijing that would traverse the Shougang (Beijing Capital Steel) complex and intersect with Lines 4 and 16.(Chinese) "北京地铁M11线2020年启动建设 将纵贯首钢整个厂区" Jan. 13, 2010(Chinese)"北京地铁16号线车站设计方案展示" 2013.4.25

Phase 1 Construction started on November 13, 2019. The western section (Phase 1) of Line 11 (Moshikou station — Xinshougang station), also known as "Winter Olympic Branch Line", is in length with 4 stations. It is fully underground.

, and stations opened on December 31, 2021. station opened on December 30, 2023.

Phase 2 According to the information released on January 11, 2022, Phase II of Line 11 to and Yangqiao is included in the "Beijing Rail Transit Phase III Construction Plan". In 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) confirmed that it will be long with 17 stations.

The section between Lize Shangwuqu and Yangqiao was not approved by the NDRC and removed from the short-term plan in 2023. On 8 July 2024, a tender announcement modified phase 2 of line 11 to be with 14 stations. It was announced that Yamenkoudong, Wujiacun, Xiaowayao, Wanfenglu, Lianhuaqiao, Maliandao, Lize Shangwuqu and Tiyuchang Nanjie (now Yamenkouxi) stations will start construction.