Line 3 is an east-west line of the Suzhou Metro. The line is 45.272 kilometers long. The line links the Wuzhong District, Suzhou Industrial Park, and the Suzhou New District.
Line 3 started trial operations from December 6 to December 10, 2019. Official operation started on December 25, 2019.
Stations
Service routes
Suzhou Xinqu Railway Station — Huaqiao (Line 11) Suzhou Xinqu Railway Station — Fengtingdadao, in rush hours
Service routes Station name Connections Distance Location ●● ITH Tram line 20.000.00Huqiu●●●● Tram line 2 (branch)●●●●●●●● ●●●● Tram line 1●●●●●●●●●●●●●●Gusu●●Wuzhong●●●●●●●●SIP●●●●●●●●●●●●●●●●●●●● KAH●●●●●●●●● ●↓Through service to/from on
Through service Through service between Line 3 and Line 11 started on December 23, 2023. During 23 December 2023 and 29 June 2024, with through train to/from line 11, Gexiangjie and Weiting were only served by Line 11 trains.
Rolling stock Fleet numbers Year built Time in service Builder Class Number in service No of car Assembly Rolling stock Number Depots Line assigned Notes 300 (50 sets) 2017-2021 2018-present CRRC Nanjing Puzhen B 60 (10 sets) 6 Tc+Mp+M - M + Mp+Tc PM101PM102PM116 030101-035006(0301-0350) Songling DepotYuanhe Yard All cars will be converted to PM259 after the first overhaul and re-equipped to Line 7 by late 2024.Cars assigned to Line 3 service out of regular service since June 29, 2024 and removed from the service since September 28, 2024. 300 (50 sets) 2023-present 2024-present CRRC Nanjing Puzhen B 210 (35 sets) 6 Tc+Mp+M - M + Mp+Tc PM247 030101-035006(0301-0350) Xushuguan DepotSouth Weiting YardChaoyang Road DepotHuaqiao Yard
Map
Gallery
References