The Somerset and Dorset Joint Railway (S&DJR, also known as the S&D, S&DR or SDJR) was an English railway line jointly owned by the Midland Railway (MR) and the London and South Western Railway (LSWR) that grew to connect Bath (in north-east Somerset) and Bournemouth (then in Hampshire; now in south-east Dorset), with a branch in Somerset from Evercreech Junction to Burnham-on-Sea and Bridgwater. Strictly speaking, its main line only ran from Bath Junction to Broadstone, as the Bath to Bath Junction section was wholly owned by the MR and the Broadstone to Bournemouth section was owned by the LSWR.

Brought under joint ownership in 1876, the S&DJR was used for freight and local passenger traffic over the Mendip Hills, and for weekend holiday traffic to Bournemouth. Criticised as the "Slow and Dirty" or the "Slow and Doubtful" (Blandford Forum station, for instance, was immortalised in 1964 in the song "Slow Train" by Flanders and Swann), it closed in 1966 as part of the Beeching axe, despite protests from the local community.

Overview The initial Somerset and Dorset Railway (S&DR) was created on 1 September 1862 by an amalgamation of the Somerset Central Railway (; opened in 1854) and the Dorset Central Railway (DCR; opened in 1860). The line ran from Highbridge to Templecombe and the line from Blandford to Wimborne, and by 1863 when a line connecting them was opened, the Somerset and Dorset Railway ran from Burnham-on-Sea to Wimborne, where trains could use a line owned by the London and South Western Railway (LSWR) to reach Poole Junction (now Hamworthy) on the Dorset south coast.

This cross-country link between the Bristol Channel and the English Channel failed to attract the substantial traffic expected and so the , falling into dire financial straits, made a desperate bid to increase their prospects by building an extension from Evercreech Junction to Bath in 1874, to link with the Midland Railway. This provided a through route between the south coast and the Midlands and the North. While producing a substantial increase in traffic, it unfortunately came too late to save the company. The went into receivership and in 1875 it became jointly owned by the Midland Railway and the , and was renamed the Somerset and Dorset Joint Railway (S&DJR). After the 1 January 1923 Grouping, joint ownership of the passed to the London, Midland and Scottish Railway (LMS) and the Southern Railway.Awdry, Christopher (1990). Encyclopaedia of British Railway Companies. Patrick Stephens Ltd. Page 237.Casserley, H.C. (1968). Britain's Joint Lines. London: Ian Allan. .

Its attractions were its quirky individuality, its varied scenery (captured particularly by the photographs and pioneering cine films taken by Ivo Peters), and the way it seemed to struggle against overwhelming odds. Its main line climbed to above sea level at Masbury, and it contained several single line sections, but on summer Saturdays it managed to handle a considerable volume of holiday trains, when it seemed every possible locomotive was drafted into service to handle heavy trains requiring double-heading and banking over the steep gradients.

The started before the railway network in England had settled down, and both local and strategic aspirations structured the line's earliest days. Work has now started to restore some remnants of the line to working condition, notably at Midsomer Norton in Somerset and Shillingstone in Dorset.

The S&D in the early 1960s

The fame of the Somerset and Dorset line reached its peak in the first years of the 1960s, just before final closure as part of the nationwide reduction of railway services, usually called the Beeching Axe.

The main line was still active, carrying local passenger trains and a daily long-distance train, the Pines Express, from Manchester to Bournemouth West, reversing at Bath Green Park. Local freight on the route survived in adequate volumes, although the Somerset coalfield was becoming ever more uneconomic to work and so coal traffic had dwindled.

On summer Saturdays, the line continued to carry a very heavy traffic of long-distance trains, from northern towns to Bournemouth and back. The traditional nature of the operation of the route was reflected in the fact that most of the originating towns were on the former Midland Railway system, almost as if the railway grouping of 1923 had never taken place. These trains brought unusual traffic combinations to the route, and the home locomotive fleet was augmented by strangers such as LMS Jubilee Class 4-6-0s from the north, though these did not work over the S&D proper, and West Country Pacifics from the south. For the summer seasons of 1960, 1961 and 1962 a small number of BR Standard Class 9F 2-10-0s, which were designed as heavy freight locomotives, were transferred to Bath locomotive depot, in an attempt to reduce the preponderance of double-heading required on the majority of trains between Bath and Evercreech Junction on account of the steep gradients encountered on either side of Masbury summit. For the same reason, during the summer months the native S&D class 7F 2-8-0s were also pressed into service to assist, or to handle lighter trains on their own.

The route remained almost entirely steam-worked until closure, though some diesel multiple units ran over the line on a couple of excursions only in the final years. After closure, diesels worked demolition trains, and some diesel workings operated to Blandford Forum after the line had closed.

Freight in the 1960s was largely in the hands of Fowler 4Fs, Stanier 8Fs, Standard Class 5 4-6-0s, and the S&DJR 7F 2-8-0s, assisted by Fowler 3F "Jinty" 0-6-0Ts and Great Western Railway Pannier Tanks; freight trains were assisted in rear by these locomotives over the Combe Down summit and over Masbury.

The Highbridge branch trains were latterly worked by GWR 2251 Class 0-6-0s, and LMS Ivatt Class 2 2-6-0.s

Geography

The S&D main line ran south from Bath Queen Square (later renamed Green Park) to Radstock, at one time the centre of the Somerset coalfield, and then over Masbury Summit, at 811 feet (274 m) above sea level, crossing the Mendip Hills, via Shepton Mallet and entering the catchment area of the River Stour to Wincanton and Blandford, joining the South West Main Line at Poole, the S&D trains continuing to the station at Bournemouth West.

The branch line from Highbridge to Evercreech Junction had been the original main line, when attracting steamer traffic across the Bristol Channel had been an objective. It traversed a sparsely populated area, and when the marine connection ceased, only Glastonbury and Street in the centre of the route contributed any worthwhile income. There had been other, shorter branches, but these too generated very little traffic and they had all closed by the early 1950s.

Serving only a string of medium-sized market towns between its extremities, the S&D generated a modest internal traffic, and had daunting operational costs, due to the difficulty of its main line. Its strategic significance was as part of a through route between the Midlands and the South Coast, by connecting with the Midland Railway at Bath. The Midland Railway linked Bath to Bristol and via Gloucester to Birmingham and the north. Heavy summer holiday passenger traffic and healthy through freight business was the result, but the long and difficult main line was always very expensive to run.

There was only one intermediate connection on the route, at Templecombe where the West of England line was crossed. There was an awkward layout there, requiring through trains to reverse along a spur between the S&D main line and the east–west main line. The full journey time for ordinary passenger trains was typically four hours, although the limited stop holiday expresses managed it in two.

Much of the S&D was single track, but the main line was double track from Midford to Templecombe, and from Blandford Forum to Corfe Mullen. Crossing trains on the single line sections always added operational interest to the line, but many enthusiasts chose to focus on the quirky operation of trains calling at Templecombe and the light engine movements associated with them. Trains had to reverse from Templecombe station to Templecombe Junction (for southbound trains, and the reverse for northbound), requiring use of a pilot engine to assist with these manoeuvres. In at least one case, a northbound train and a southbound train, both requiring to call at Templecombe station, were timed to arrive at Templecombe Junction simultaneously. The operating procedure was for the northbound train to set back on to the southbound train at the junction, thence to be pulled into the station by the southbound train engine, with the northbound engine still on the back. After completion of station work, the entire equipage was pulled back to the junction by the northbound train engine, where the two trains were uncoupled to continue on their separate ways.

History The Somerset and Dorset Joint Railway came into existence on 1 November 1875.Robin Atthill & O. S. Nock, 1967. The Somerset & Dorset Railway. Newton Abbot: David & Charles. . It was formed when the Somerset and Dorset Railway ran into unmanageable financial difficulties and they leased the line for 999 years to the Midland Railway and the London and South Western Railway jointly.

The origins of the Somerset and Dorset Railway lay with two separate companies, which built sections of line, each with their own ambitions.

Somerset Central Railway The Somerset Central Railway started out as a local railway line designed to give Glastonbury transport access for manufactured goods, to the Bristol Channel and to the Bristol and Exeter Railway's main line. It soon saw that a longer connection southwards was useful, and made an alliance with the Dorset Central Railway, and built an easterly line to join that railway at Cole.

Origins

The Somerset Central Railway was authorised by the (15 & 16 Vict. c. lxiii), and opened on 28 August 1854 from Glastonbury to Highbridge Wharf. Glastonbury was then an important manufacturing town, but its location made the transport of goods difficult. Coastal shipping was still dominant for transport and the Bristol Channel ports of Bridgwater and Highbridge were about 18 miles away. The Bristol and Exeter Railway (B&ER) had been opened, passing through both those towns, in 1841.

Highbridge was chosen as the destination because a route to Bridgwater would have been much more challenging technically, because of high ground to the east of Bridgwater itself. The Glastonbury Canal had been bought by the friendly , and by arrangement with them the canal was closed and the railway built partly on the course of the canal, reducing construction cost.

The line was opened as broad gauge, as a feeder to the , and had stations at Glastonbury, Ashcott, Shapwick, Edington, Bason Bridge (opened in 1862) and Highbridge at the station. There were goods facilities at Highbridge Wharf, to the west of the line. The line was worked operationally by the .

Initial results were encouraging, and the original objective of the railway, to give Glastonbury access to the maritime and railway transport links at Highbridge, was successfully achieved.

Development Highbridge Wharf became a hive of activity, and at this early date coastal shipping was still an important means of transporting goods. To reach South Coast destinations the ships had a difficult and hazardous passage round Land's End, and there were hopes that the railway could become the core of a transport chain bringing manufactured goods, especially metal goods, from South Wales to the Southern Counties, and taking agricultural produce back to feed the industrial population in South Wales, using shipping across the Bristol Channel.