Line 7 of the Shenzhen Metro has a length of and a total of 29 stations. It connects SZU Lihu Campus to Tai'an, travelling East–West across Shenzhen in a "V" shape. Construction started on 23 October 2012, with track laying complete in April 2016. The line started service on 28 October 2016.

History SegmentCommencementLengthStation(s)Name Xili Lake — Tai'an 28 October 2016 27 (initial phase) Xili Lake — SZU Lihu Campus 28 December 2024 2 Phase 2 (east extension)

Stations Serviceroutes Station name Connections Nearby bus stops Distance Location ●0.000.00Nanshan●1.031.03●1.332.36● 2.034.39●0.735.12●1.136.25●1.557.80●0.888.68●●1.289.96● 1.8311.79Futian●1.9713.76● 1.5815.34●1.5016.84●0.8417.68●1.3719.05●0.6319.68● 0.6320.31●0.8521.16Fulin1.0422.20●0.8023.00●0.7623.76● 0.7024.46●0.6225.08●0.8025.88●1.1627.04●1.0228.06Luohu●0.7128.77●1.2630.03●0.7030.73●1.2331.96 ●Wenti ParkNanshan

Staff-only branch A branch to Wenti Park station is operating. Wenti Park station is a staff-only station.

Rolling stock In 2014, Shenzhen Metro Group purchased 70 trains (420 carriages) from CNR Changchun Railway Vehicles for the future Line 7 and Line 9, in which Line 7 will use 41 while Line 9 will use 29. The first train arrived in mid-March 2016.

Type Date of manufacture Series Sets Serial number Assembly NotesType A 2015–2016 A-size stock 410701-0741Tc+Mp+M+M+Mp+Tc Manufactured by CRRC Changchun Railway Vehicles

References