The Gov. William Preston Lane Jr. Memorial Bridge (informally called the Chesapeake Bay Bridge and, locally, the Bay Bridge) is a major dual-span bridge in the U.S. state of Maryland. Spanning the Chesapeake Bay, it connects the state's rural Eastern Shore region with its urban and suburban Western Shore, running between Stevensville and Sandy Point State Park near the capital city of Annapolis. The original span, opened in 1952 and with a length of , was the world's longest continuous over-water steel structure. The parallel span was added in 1973. The bridge is named for William Preston Lane Jr., who, as the 52nd Governor of Maryland, launched its construction in the late 1940s after decades of political indecision and public controversy.

The bridge is part of U.S. Route 50 (US 50) and U.S. Route 301 (US 301), and serves as a vital link in both routes. As part of cross-country US 50, it connects the Baltimore–Washington Metropolitan Area with Ocean City, Maryland, Rehoboth Beach, Delaware, and other coastal tourist destinations. As part of US 301, it serves as part of an alternative route for Interstate 95 travelers, between northern Delaware and the Washington, D.C., area. The bridge is busy and often congested with traffic, particularly during peak hours and summer months.

The bridge's role in transportation was filled by ferries before the first span's construction. The bridge has fostered the state's economic growth, particularly of Queen Anne's County and Ocean City. Further expansion of the bridge has been discussed since 2004, with a task force being formed to investigate the possibility of building a third span.

History

Proposals and ferries It is possible that studies may have been conducted as early as the 1880s into the possibility of a bridge across the Chesapeake Bay. However, the first known proposal came about in 1907 and called for a crossing between Baltimore and Tolchester Beach. In 1927, local businesspeople were authorized to finance the construction of a Baltimore to Tolchester Beach crossing. Plans for the new bridge were made, but construction was canceled following the Wall Street Crash of 1929 with the collapse of the American economy and resulting Great Depression of the 1930s.

Ferries were used as the main mode of transportation across the bay from the colonial period until the completion of the 1952 bridge. The first service ran from Annapolis to Broad Creek on Kent Island, roughly where the bridge is today. In 1919, the Claiborne–Annapolis Ferry Company began running ferries between Annapolis and Claiborne, a community near St. Michaels.

In July 1930, the Claiborne–Annapolis Ferry Company added a new route, one running from Annapolis to Matapeake, a significantly shorter distance. The auto and passenger ferries were taken over by the State Roads Commission in 1941 (reorganized into today's State Highway Administration of the Maryland Department of Transportation in 1973). Two years later, the commission moved the western terminus of the old Annapolis–Matapeake ferry to Sandy Point (later adjacent to Sandy Point State Park), shortening the cross-bay trip.

Construction of 1952 span

A 1938 proposal by the Maryland General Assembly was the first to call for a bridge at the Sandy Point–Kent Island location. Although the legislation authorizing the new bridge passed, the involvement of the United States in World War II delayed the bridge's construction. In 1947, with the war over, the Assembly, under the leadership of Maryland Governor William Preston Lane Jr., (1892–1967), passed legislation directing the old State Roads Commission to begin construction. Ground was broken in January 1949, and after a -year construction project, the bridge opened to traffic on July 30, 1952, as both the longest continuous over-water steel structure, and the third longest bridge in the world. Before the opening, a parade of vehicles made the first official crossing, led by then current Governor Theodore Roosevelt McKeldin, (1900–1974), and other state officials in a distinctive white Cadillac convertible flying huge American and Maryland flags. On November 9, 1967, the bridge was dedicated to Governor Lane, who had died earlier that year, and officially renamed the "William Preston Lane Jr. Memorial Bridge".

1973 expansion and later construction In 1967, due to increasing traffic volume, the Maryland General Assembly authorized three possible new crossings, all suggested during the 1964 Chesapeake Bay crossing study. These included one further north near Baltimore, one in southern Maryland, and an additional span to be added to the existing bridge from Kent Island to Sandy Point; ultimately, the third option was chosen. Construction of the new parallel span began in 1969 to the north of the original bridge, and it was completed on June 28, 1973.

From 1986 to 1988, the eastbound Chesapeake Bay Bridge had its deck replaced. This resulted in all traffic temporarily using the westbound span.

From 2006 to 2010, the westbound Chesapeake Bay Bridge had its deck replaced.

Notable incidents

Because of its height, the narrowness of the spans, the lack of hard shoulders, the low guardrails, and the frequency of high winds, it is often cited as one of the scariest bridges in the world, especially by drivers of tractor-trailer trucks.

The bridge has been closed four times by high winds: on September 18, 2003 (Hurricane Isabel); August 27, 2011 (Hurricane Irene; (then-Governor Martin O'Malley ordered the bridge closed when sustained winds exceeded ); October 29, 2012 (Hurricane Sandy); and March 6, 2013 (the March 2013 nor'easter).

On August 10, 2008, a tractor trailer involved in a head-on collision near the west end fell from the bridge; the driver died in the crash. The incident highlighted concern that the bridge may not be structurally safe, but the Maryland Transportation Authority (MDTA) discounted any structural or engineering problems with it. Inspections of the wall in the weeks following the accident revealed that there was deterioration in the form of corrosion of the steel reinforcements inside barriers; this prompted immediate repairs to the wall.

On June 24, 2024, traffic on both spans was suspended for nearly 30 minutes in late morning as the cargo ship MV Dali passed under, escorted by tugboats, on its journey from the Port of Baltimore to Virginia International Gateway in Norfolk, VA. The Dali had collided with Baltimore's Francis Scott Key Bridge on March 26, leading to that bridge's collapse.

Specifications and operations

With shore-to-shore lengths of , the two spans of the bridge form the longest fixed water crossing in Maryland. The bridge's western terminus is in Sandy Point State Park, located northeast of Annapolis in Anne Arundel County, and its eastern terminus is in Stevensville on Kent Island in Queen Anne's County. The two spans are relatively similar in height, with the older span at and the newer span at .

Structural details With the exception of the number of lanes on each (two on the original span and three on the newer span) and differences owing to the design standards for the periods in which they were built, the spans are structurally similar. Both were designed by J. E. Greiner Company, which later became a part of AECOM through the company's acquisition of URS Corporation. Each span features: Two main spans over the bay's two shipping channels: A long suspension section over the western channel with a maximum clearance of at the main span—high enough to accommodate ocean-going vessels and tall ships A through-truss cantilever span over the eastern channel Deck truss and steel girder spans flanking the main spans Concrete beam spans on the portions closest to the shores A curve near the western terminus, which is required so that the main spans cross the bay's shipping channels at 90 degrees per United States Army Corps of Engineers requirements

Traffic control

Traffic patterns on the bridge's five lanes can be adjusted via its lane control system, which consists of overhead lane control signals on both spans and approaches. Typically, the two lanes on the south-most span are configured for vehicles traveling east on eastbound US 50/US 301, while the three lanes on the north-most span are configured for vehicles traveling west on westbound US 50/US 301; the spans are therefore referred to as the "eastbound span" and "westbound span", respectively. However, this pattern is adjusted during incidents or peak travel times: for instance, on the outset of weekends when there is a high volume of beach-bound traffic, one lane on the westbound span is configured for eastbound traffic.

In 2006, pink markers were placed along the eastbound span to mark out the suggested following distance, similar to systems used in Minnesota and Pennsylvania. The markers are a part of the MDTA's "Pace Your Space" campaign to prevent vehicle collisions and traffic congestion due to tailgating on the bridge.

In April 2013, changes were made to increase safety on the westbound span during two-way operations: signs, pavement markings, and rumble strips were modified, and a buffer zone between the left and center lanes was created. As a result, motorists can no longer switch between the left and center lanes, whether or not two-way operations are in effect. Two-way traffic may occur on the eastbound span during overnight roadwork or during emergency situations that close the westbound span, on which two-way traffic is more common. When the MDTA closes either span for overnight roadwork, it implements two-way traffic on the span that remains open. During eastbound span closure, two-way traffic operates on the westbound span with the center lane closed.

In January 2020, Governor Larry Hogan announced that the tollbooths on the eastbound side of bridge were being removed in preparation for all-electronic tolling on the Kent Island side of the eastbound bridge. The merged lanes tie directly into the two lanes on the eastbound bridge. The MDTA is replacing lane control signals on both bridges with those that have flashing strobe lights to indicate a lane closure or a lane with contraflow traffic, and is installing an automated gate system on the bridge to allow quicker implementation of two-way traffic on the bridge. The automated gate system will reduce traffic congestion when implementing two-way traffic. Illuminated pavement markings will be installed to show where the crossovers are during two-way traffic operations. MDTA crews will no longer have to manually open and close the crossovers for two-way traffic operations.

The MDTA has used traffic cones and barrels to open and close crossovers, and to create tapers for the reversible lane. When two-way traffic is implemented, the MDTA momentarily stops traffic to reposition traffic cones and barrels to taper traffic into the reversible lane. MDTA Police then escort traffic across the bridge in the reversible lane. The MDTA will not implement two-way traffic in certain weather conditions, including excess precipitation and high winds. The MDTA may stop all traffic when the wind speed exceeds 55 mph. Two-way traffic on the bridge requires all associated signage and systems to be operational. The MDTA has to monitor two-way traffic operations on the bridge due to the length of the bridge and its lack of shoulders. The MDTA will stop two-way traffic if westbound delays pile up, at which point westbound traffic will be prioritized. Any time contraflow traffic is implemented on either of the bridges, the speed limit for the contraflow lane is reduced to 40 mph while the other lanes remain at 50 mph. MDTA Police will momentarily stop traffic for MDTA crews to reposition traffic cones and barrels to close off the left lane leading up to the bridge in the event of inclement weather during contraflow traffic.

Tolls and fees