This is a list of metro stations of Baku Metro in Baku, Azerbaijan. At present Baku Metro has 27 metro stations. The Red Line (Qırmızı xətt) has 13 metro stations, the Green Line (Yaşıl xətt) has 10 metro stations and the Purple Line (Bənövşəyi xətt) has 4 metro stations.

Stations

Line(s)Number of Stations Structure Opening date Length(km) M11312 Underground, 1 Surface 196720.1M21010 Underground197614.5M343 Underground, 1 Surface 20166.1Total2740.7

+List of open stations Station name (English) Station name(Azerbaijani) Line(s) Structure Opening date Interchange Icheri Sheher Baku Soviet (1967-2007)İçərişəhər Bakı Soveti (1967-2007) pylon, deep Sahil 26 Baku Commissars (1967-1992)Sahil 26 Bakı komissarı (1967-1992)pylon, deep 28 May 28 April (1967-1992)28 May 28 Aprel (1967-1992) pylon, deep "Airport Transfer Bus" GanjlikGənclik columnar, medium deep Nariman NarimanovNəriman Nərimanov columnar, medium deep Bakmil Elektrozavod (1979-1998) Bakmil Elektrozavod (1979-1998) isurface, one-way UlduzUlduz columnar, medium deepKoroglu Mashadi Azizbeyov (1972-2011)Koroğlu Məşədi Əzizbəyov (1972-2011) columnar, medium deep Park and ride "Airport Transfer Bus" Gara Garayev Avrora (1972-1991)Qara Qarayev Avrora (1972-1991) columnar, medium deep NeftchilarNeftçilər columnar, medium deep Halglar DosluguXalqlar Dostluğu columnar, medium deep AhmedliƏhmədli columnar, medium deep Hazi AslanovHəzi Aslanovcolumnar, medium deep DarnagulDərnəgül single-vault, medium deep Azadlig ProspektiAzadlıq prospektisingle-vault, medium deep NasimiNəsimicolumnar, medium deep Memar AjamiMemar Əcəmi columnar, medium deep 20 Yanvar XI Red Army Square (1985-1992) 20 Yanvar XI Qızıl Ordu Meydanı (1985-1992) columnar, medium deep Inshaatchilar'İnşaatçılarcolumnar, medium deep Elmlar AkademiyasıElmlər Akademiyası pylon, deepNizami GanjaviNizami Gəncəvipylon, deep Jafar JabbarliCəfər Cabbarlı pylon, deep "Airport Transfer Bus" Shah Ismail Hatai Shaumyan (1968-1992) Şah İsmail Xətai Şaumyan (1968-1992) pylon, deep KhojasanXocəsən surface, one-way AvtovagzalAvtovağzal single-vault, medium deep Park and ride Memar Ajami-2Memar Əcəmi-2 single-vault, deep 8 Noyabr8 Noyabr single-vault, deep

Stations under construction

There are 5 stations under construction.

Station name(English) Station name(Azerbaijani) Line(s) Structure Opening date Interchange 20 September 20 Sentyabr single-vault, deep (Under Construction)2026Darnagul Depot Dərnəgül Deposu surface, one-way (Under Construction)2027 White City (Y-14) Ağ Şəhər On-Hold "Construction of the intermediate section on the Green Line between Xatai and Hazi Aslanov with three new stations started in Aug. 2013" Until 2030 "Transfer by Tram in the Future" Baku Oil Refinery (Y-15) Azər Neft Yağ On-Hold "Construction of the intermediate section on the Green Line between Xatai and Hazi Aslanov with three new stations started in Aug. 2013" Until 2030 Hazi Aslanov-2 (Y-17) Həzi Aslanov-2 On-Hold "a 3 km section of the second line from Hazi Aslanov to Yeni Gunesli (3 stations) was supposed to open in 2015 after construction had started in August 2011."Until 2030Kohne Guneshli (Y-18) Kohne Gunesli On-Hold "a 3 km section of the second line from Hazi Aslanov to Yeni Gunesli (3 stations) was supposed to open in 2015 after construction had started in August 2011."Until 2030

See also

List of metro systems

References

External links

Baku Metro Urbanrail – Baku Metro