The Hogan's Fountain Pavilion was a large gazebo and picnic shelter of mid-century modern architecture built in 1965 and located in Cherokee Park, Louisville, Kentucky, United States. It was a prominent landmark in Cherokee Park until it was demolished in 2023.

The pavilion was available to rent for a variety of events. When not rented, the pavilion was freely accessible to all park visitors. It was the most popular site within the park, renting for $150 per day, and raised more than $18,000 a year. It was located atop Bonnycastle Hill and acted as an architectural centerpiece along the park's scenic loop.

The pavilion itself had a 200-seat capacity, with eight grills and picnic tables. The area surrounding the pavilion features a playground, a spray ground, a basketball court, horseshoe pits, an area for volleyball, and a softball field. Hiking and biking trails are also located near the pavilion.

Structure and development

Architect The Hogan's Fountain Pavilion was originally designed by Edward Jacob (E.J.) Schickli Jr., of Tafel–Schickli Architects in 1964. Schickli felt that a conical "wigwam" or "teepee" shaped design was appropriate as it reflected Cherokee Park's Native American-derived name.

Born in January 1928, Schickli graduated from MIT in 1950, became a registered architect in 1954, and became President of the West Kentucky Chapter of the American Institute of Architects (AIA) in 1961. Other prominent civic contributions by Schickli included the design of the original Louisville Zoo and Botanical Gardens in 1969 and Louisville's Standiford Field Airport expansion project in 1970, currently called the Louisville Muhammad Ali International Airport.

Design

The pavilion had an atypical, octagonal-shaped roof. Designed to be rustic in appearance, the pavilion was intended to have a wood shake shingle roof. However, per a notation by M. Newton on February 5, 1965, into the original blueprint, he approved the shingle change from shake to that of cement shingles laid over a single layer of 15 lb. asphalt felt.Open records request from Metro Parks, August 2010. The shape of the shelter garnered a great deal of media and public attention. "It will be a departure from the usual rectangular-shaped shelters built in parks in the past." Al Blunk, photographer for the Louisville Times, captured an early construction shot of the raising of the oversized laminated wood beams. The Louisville Times reported, "Beams curve skyward, hinting at the shape of things to come."

The floor of the pavilion was constructed of a round concrete pad, originally with a large interior circular fire pit surrounded by wooden picnic tables. Above the fire pit was a diameter smokestack which provided proper venting. The sides of the building were left open to help facilitate cooling by transferring the warm air upward through an opening at the top. Exiting the top of the covered roof, copper was clad to the exposed structural beams to cap them from the elements. The addition of copper gutter beds and scuppers highlighted the unconventional structure.

The laminated wood beams were anchored in eight concrete buttresses sheathed with native stone from the area. Lastly, a rectangular brick façade building was attached to the west side of the pavilion that housed the restrooms.

The finished teepee structure measured wide by 56 ft in height.

History Commissioned by the City Director of the Department of Parks and Recreation, George F. Kinkead in 1964, the originally named Hogan's Fountain Pavilion and Comfort Station, which was subsequently shortened to Hogan's Fountain Pavilion project was put out for bids. Out of 15 offers, the bid from C.G. Campbell & Son, Inc. was chosen and they were awarded a contract of $49,915 with a projected "ready for use" time of early May 1965.

According to Cynthia Johnson in a 2012 Local Landmark Designation Report for the Metro Historic Landmarks and Preservation Districts Commission, "the facility was originally named the McCall Shelter in honor of Alderman C.W. 'Ches' McCall who was killed in an auto accident in 1962. ... Although the structure was officially named for McCall, the local vernacular continues to refer to the shelter as the 'Teepee'."

In October 1965, Mayor William Cowger dedicated the pavilion.

1973 tornado damage and repairs On April 3, 1974, Louisville experienced an unprecedented number of tornadoes, dubbed "The Super Outbreak". The National Oceanic and Atmospheric Administration reported "massive devastation, 335 dead . . . more than 6,000 injured" in the storms. Approximately 2,200 or (75%) of the park's mature tree population was destroyed by the tornado. However, the pavilion survived aside from some missing shingles.

After the tornado an ad was placed in the Louisville Times on September 30, 1974, requesting bids on repairing the pavilion's roof. Six bids were entertained with the highest being $8,975 and the lowest from Kentucky Lumber Co. who was awarded the contract for $2,110 labor. The materials for the roof consisted of 15 squares of 18" x 1/2" hand split cedar shake shingles and 160 linear feet of hip shingles at a cost of $652. Work on the roof began on September 18, 1975.Open Record Request from Metro Parks, February 25, 2011.

In an effort to repair the damaged roof at a cost-saving, Parks Department officials elected to place the wood shake over the existing cement shingles.

Engineers Rangaswamy, Hatfield and Associates were paid $2,000 on October 6, 1978, for detailing needed structural repairs to damaged support beams. An ad was placed in the Louisville Times on December 4, 1978, requesting bids. In 1979, structural beams #6 and #7 were encased in steel to strengthen the pavilion's supports for $12,000.

Engineers Rangaswamy, Yost and Associates were contracted by the Parks Department for what was dubbed Phase II of needed pavilion repairs. On June 30, 1983, some painting was done and repairs were made to the smoke hood and flue. The creek stone on the abutments was also tended to for the amount of $850. On July 15, 1983, work began to encase the water damaged beams #1, #3, #5 and #8 in steel at a cost of $16,000.

The March 2, 1989 repair drawings explained the process of inserting two rows of ¾" solid rods 12" deep thru the existing beams, plug welding and then grinding smooth, whereas the commencement of encasing beams #2 and #4 with ¼" steel began. Additionally a 90˚ bent ¼" steel plate was welded onto all eight beams to prevent children from climbing onto the roof.

Fall into disrepair after 1994 In 1994, the Parks Department and the Olmsted Parks Conservancy stated they would be "removing the tepee when its natural life span ends" as part of a Master Plan to recapture the original 1892 design that Frederick Law Olmsted envisioned for Cherokee Park.

After 1994, upkeep of the pavilion became nearly nonexistent. There had not been any maintenance concerning the wood shingles since 1989 and as a consequence the roof degraded to a very poor condition allowing substantial moisture infiltration by the elements. Additionally, the stone surrounding the buttresses became loosened and was separating from the concrete beneath it. Through an open records request,Open records request from Metro Parks, August 9, 2010. it was determined that from April 2007 to August 2010, the only repairs performed on the pavilion were to two barbecue grills.

2010 plans for removal In May 2010, the Louisville Metro Parks Department and the Olmsted Parks Conservancy announced a second Master Plan for the Hogan's Fountain area, including the replacement of the Hogan's Fountain Pavilion. The plan would replace the pavilion with two smaller box-like structures.

As with the earlier 1994 Master Plan, the Olmsted Parks Conservancy's primary stated goal was to preserve Olmsted's 1892 vision of the park. The Olmsted Parks philosophy of "restore, enhance and preserve" had gradually implemented removal of elements that were inconsistent with the Olmsted design intent."Frederick Law Olmsted Sr. "advised the Board of Park Commissioners to resist public demands for golf courses, tennis courts, ball fields, and other forms of active recreation in the large parks." The pavilion was not original to the park and did not seem to match the style of the rest of the park. Officials also claimed the cost of repairing the pavilion would be higher than the cost to replace the pavilion. Environmental concerns were also raised, with the frequent use of the structure potentially causing "erosion, soil compaction and damage to nearby historic trees".

In March 2010, Louisville resident Lark Phillips led a number of citizens interested in preserving and restoring the Hogan's Fountain Pavilion to form the Save Hogan's Fountain Pavilion group in hopes of saving the architectural structure from demolition under the second Master Plan for the park.

Meetings between the preservation group and Metro Parks Department Director, Mike Heitz, resulted in the temporary delay of any removal or replacement of the pavilion, on the condition that private funds were raised to repair the iconic structure. The Olmsted Parks Conservancy had solicited one bid in August 2009 to repair the pavilion roof, in the amount of $148,500 from Merrick-Kemper of Louisville.Open records request 2010 from Metro Parks. The preservation group sought out additional bids for the work. Integral Structures of Louisville reviewed the condition of the roof and agreed to donate a substantial portion of the labor and forego any mark-up on materials for a repair cost of $82,000. In November 2011, Commonwealth Roofing gave an estimate of $35,895 to repair the pavilions roof which reflected a donation of the overhead and profit, as well as a portion of the labor.

After two years of fundraising the preservation supporters had raised the necessary funds to repair the pavilion's roof and approached the Parks Department for a logistics meeting.Meeting between Save Hogan's Fountain Pavilion and Metro Parks Department in March 2012. However, shingles on the pavilion's roof had recently tested positive for asbestos and were non-friable.Photo of report in Gallery. The Metro Parks Department mandated that a professional asbestos abatement firm remove the shingles. They received a quote from National Environmental Contracting (NEC) on April 9, 2012, in the amount of $28,129, thus raising the price tag to restore the pavilion. As of August 2012, the Save Hogan's Fountain Pavilion group had raised over $45,000 towards its goal to repair the roof of the pavilion.

Alternate plans In October 2009, prior to the finalization of the Hogan Fountain Area Master Plan in December 2010, there were two alternate concepts proposed for this location. The first concept included the renovation of the existing pavilion and plans to build a second, smaller shelter to the south side of the Hogan's Fountain area. The larger shelter could be reserved for larger functions, with the smaller one available simultaneously for family picnics or smaller events. The second concept showed the removal of the existing pavilion and its replacement, along with the plans for the additional smaller shelter to the south side of the Hogan's Fountain area. In October 2009, Concept #1 of the Master Plan solved most concerns the Metro Parks had for the Hogan's Fountain area, but this option was eliminated in the 2010 final Master Plan. Renderings of this failed option can be seen on the Louisville Metro Parks website.

Opponents