The Schifferstadt–Wörth railway or Speyer line is a uniformly double track and electrified main line in the German state of Rhineland-Palatinate. Between Schifferstadt and Germersheim it is part of the network of the Rhine-Neckar S-Bahn. Between Germersheim and Wörth am Rhein it is part of the network of the Stadtbahn Karlsruhe.
The first section between Schifferstadt and Speyer was opened on 11 June 1847 and it was extended to Germersheim in 1864. The opening of the last section to Wörth am Rhein was opened in 1876. From 1906 to 1914, it was served by long-distance services, which ended after the First World War and the subsequent reincorporation of Alsace-Lorraine into France. Electrification was begun in 2006 and completed in 2010.
History
Beginnings and emergence of the Schifferstadt–Germersheim section Originally the administration of the Circle of the Rhine (Rheinkreis), which was part of Bavaria, planned that its first railway line would be first in the north–south direction. Instead, the Palatine Ludwig Railway (Pfälzische Ludwigsbahn) was built between 1847 and 1849 from Rheinschanze (Ludwigshafen from 1853) to Bexbach; this mainly served the transport of coal. A route via Speyer, which was then the capital of the Circle of the Rhine (similar to the modern concept of the Palatinate), was considered instead of a route via Rheinschanz island, on which the city of Mannheim had built a fortification on the opposite bank of the Rhine. This alternative was dropped, since the main traffic flowed towards Mannheim at that time. In 1838, however, it was determined that Speyer should be linked to the main line via a branch line.
The Palatine Ludwig Railway Company (Pfälzische Ludwigsbahn-Gesellschaft) opened a branch line from Schifferstadt to Speyer with the commissioning of the Rheinschanze–Neustadt section of the Ludwig Railway on 11 June 1847.
Plans for a north–south connection were subsequently developed. There were two options for discussion: one would run from Neustadt via Landau to Wissembourg in Alsace and continue from there to Strasbourg. The other would have extended the branch to Speyer via Germersheim and Lauterbourg to Strasbourg. The first option prevailed, because France hesitated and because the former option passed through territory that was more densely settled than a route along the Rhine valley.
The section to Germersheim was opened on 14 March 1864 at a cost of a total of one million gulden, after being delayed by difficulties on agreeing on a route past its fortress.
Closing the gap to Wörth and further development In the same year, a committee met in Rülzheim, which called for an extension of the line to Wörth. Apart from representatives from Rülzheim, it included representatives of Germersheim, Bellheim, Rheinzabern, Wörth and Maxau. It was at first unclear whether the town of Germersheim should be bypassed to the west or east. The former option would have been longer and more expensive. The Franco-Prussian War delayed the implementation of the project.
The municipality of Kandel, which since 1864 had been served by the line from Winden to Karlsruhe campaigned for a route that passed through its territory. The administration of the Palatinate Railway (Pfälzische Eisenbahnen), to which the Ludwig Railway Company had belonged since 1870, rejected this proposal on 20 November 1871 since such a route would have required a detour which would have reduced traffic on the line. Kandel, however, did not give up immediately, and had its plan rewritten. Nevertheless, the chosen route went through Wörth. This was approved on 15 March 1874. The construction of the line went forward without any major problems and it was opened on 25 July 1876, along with its continuation via Lauterbourg to Strasbourg. Unlike the Schifferstadt–Germersheim section, the newly opened section of the track was owned and operated by the Palatine Maximilian Railway (Pfälzische Maximiliansbahn-Gesellschaft). The line from Schifferstadt to Lauterbourg had two tracks from 1906. The express trains from Berlin to Strasbourg, which had previously run via Neustadt and the Neustadt–Wissembourg railway, now ran via Speyer and Germersheim as this route was shorter and the new track provided sufficient capacity.
The line, along with the other railways within the Palatinate, was absorbed into the Royal Bavarian State Railways (Königlich Bayerische Staatseisenbahnen) on 1 January 1909.
Development after the First World War After the First World War, Alsace-Lorraine was returned to France and the long-distance services to it also ended, since the newly founded Deutsche Reichsbahn wanted trains to run as far as possible within Germany. Instead, the long-distance services ran over the Rhine Valley Railway. The Reichsbahn allocated the line to the newly created Reichsbahndirektion (railway division) of Ludwigshafen in 1922. In 1936 the route line was reallocated during the dissolution of the latter – with the exception of Wörth station – to the railway division of Mainz. Deutsche Bundesbahn (DB), which was responsible for railway operations from 1949, assigned the line to the railway division of Mainz, which was responsible for all railway lines within the newly created state of Rhineland-Palatinate. In the course of the staged dissolution of the railway division of Mainz from 1 August 1971, its counterpart in Karlsruhe took responsibility for the station. Up to 1980, an express train ran from Strasbourg to Ludwigshafen, which served the French military in particular.
The line to Germersheim was electrified and the stations and halts were modernised with the establishment of S-Bahn operations between Schifferstadt and Germersheim. Karlsruhe Stadtbahn services have operated between Germersheim and Wörth, continuing to/from Karlsruhe, since December 2010.
Between Germersheim and Wörth, the platforms of the stations that already existed before 2010 differ from the other Stadtbahn platforms in the area of the Karlsruher Verkehrsverbund (Karlsruhe transport association, KVV) in having a length of 160 m to allow the commuter trains to and from BASF to stop there. The usual platform length for a triple set is 120 m. Both tracks, including all points, were completely replaced over the whole Germersheim–Wörth section during the summer holidays of 2007. Because of finds of unexploded bombs from the Second World War in the track bed in the area of Jockgrim the construction work was extended by a week. The line was also completely closed during the Easter break of 2010. At this time the platforms were partly renewed and the electrification started. Furthermore, the line was blockaded because of the construction from 5 July 2010 until 12 December 2010.
Route The 50 km-long railway line begins in Schifferstadt, where it branches to the left from the Palatine Ludwig Railway. It runs directly to the southeast to the outskirts of Schifferstadt and continues through the woods between Schifferstadt and Speyer. A few hundred metres after a junction with part of the former Heidelberg–Speyer railway that is still used as an industrial railway, the line curves to the south.
While still in the city of Speyer it curves again to the southwest and runs almost straight, passing the community of Römerberg to the west of its built-up area. Shortly before Lingenfeld it curves left and runs south between the built-up areas of Lingenfeld and Lingenfelder Altrhein. On this section of the line used to converge with the Germersheim–Landau railway, which came from the right and ran parallel with the Speyer line as far as Germersheim.
In Germersheim the line takes an odd course: after its exit from the station it makes an S-shaped double curve and runs around the east of the town, instead of passing Germersheim to the west, which would have been possible at the time because the old town was far enough to the east. The Bruhrain Railway branches off the line at Germersheim station and runs parallel to the left of the Speyer line about halfway around the town before turning east to cross the Rhine. The Speyer line makes another S-curve and leaves Germersheim behind.
The line then runs to Sondernheim, where it curves to the west to Bellheim, where it turns back to the south and runs to Rülzheim. In northwestern Rülzheim, it makes a lazy S-curve and then continues south, cutting through Rheinzabern and Jockgrim to connect with the Palatine Maximilian Railway and the Bienwald Railway in Wörth am Rhein.
Operating points Schifferstadt
Schifferstadt station is the starting point of the Schifferstadt–Wörth railway. It is located on the north-western outskirts of Schifferstadt. It was opened at the same time as the branch from the Rheinschanze–Neustadt section of the Ludwig Railway to Speyer, making Schifferstadt the first railway junction in the Palatinate.
Schifferstadt Süd
The halt of Schifferstadt Süd (south) is located on the southern outskirts of Schifferstadt, near the school centre. It was built after the Second World War.
Speyer Nord-West The halt of Speyer Nord-West (northwest) connects the suburbs of Speyer-Nord and Speyer-West to the rail network.
Speyer Hauptbahnhof
Speyerer Hauptbahnhof was the terminus of the branch line beginning in Schifferstadt from 1847 to 1864. Its entrance building was destroyed in the Second World War and a new one was built at the end of the 1950s. The former freight shed is still preserved and is located south of the station building. Although there are still freight operations, it is no longer used for railway operations and it is currently vacant.
Speyer Süd The development programs for Rheinland-Pfalz-Taktes 2015 (the Rhineland-Palatinate integrated regular interval timetable for 2015) and for the second stage of construction of the Rhine-Neckar S-Bahn included the construction an additional halt in the south of the city of Speyer, called Speyer Süd. After ten years of delay, the city council of Speyer decided in August 2012 to build the halt at Dr.-von-Hörmann-Straße in the immediate vicinity of the Speyer-Südwest special area.
Berghausen (Pfalz) The former station and current halt of Berghausen (Pfalz) is located on the western edge of Berghausen, a district of Römerberg. The former entrance building and the freight shed are no longer used for railway operations.
Heiligenstein (Pfalz) The former station and the present halt of Heiligenstein (Pfalz) is located on the western edge of Heiligenstein, a district of Römerberg. The former entrance building and the freight shed are no longer used for railway operations.
Lingenfeld The former Lingenfeld station has now been restored as a halt. For historical reasons – the village grew very quickly after the railway was opened – it is located at the extreme north-eastern edge of the village. Its former entrance building and the freight shed are no longer used for railway operations. The former Germersheim–Landau railway also ran through the centre of Lingenfeld but it never had a station in the village.
Germersheim