The Cawood, Wistow and Selby Light Railway (CW&SLR) was a short light railway in a rural part of Yorkshire, England. The company was sometimes referred to as the Cawood, Wistow and Selby Railway.CW&SR Clock in the National Collection NRM

Precursor line

An act of the Parliament of the United Kingdom, the (42 & 43 Vict. c. cxxviii) allowed the construction of the from a junction at Church Fenton through Cawood to Wistow.Acts of the Parliaments of the United Kingdom Part 77 (1879a), c.cxxviii : Church Fenton, Cawood and Wistow Railway, www.opsi.gov.uk Further acts were passed; the (45 & 46 Vict. c. ccxxiii) authorising a junction line to the Hull and Barnsley Railway (HBR) at Drax,Acts of the Parliaments of the United Kingdom Part 84 (1882b), c.ccxxiii : Church Fenton, Cawood and Wistow Railway, www.opsi.gov.uk and the Selby and Mid-Yorkshire Union Railway Act 1883 (46 & 47 Vict. c. cxvi) authorising an extension to Selby, and changing the name of the company to Selby and Mid-Yorkshire Union Railway. In the event, the necessary capital could not be raised, so neither of the extensions nor the original line were built, the Drax branch proposals were abandoned by the (52 & 53 Vict. c. lxxiii), and the entire remaining scheme was abandoned by the (53 & 54 Vict. c. xii).

History

In the 1890s the Cawood, Wistow and Selby Light Railway Company (CW&SLR) was formed at the initiative of light railway entrepreneur Sebastian Meyer, acting with a group of men of influence in the region. The North Eastern Railway (NER) gave "generous assistance", which appears to have amounted to moral support, advice and lack of opposition, but no cash. The company applied to Parliament for permission to build a light railway along similar lines to the earlier act of Parliament, but terminating to the north at Cawood. The (59 & 60 Vict. c. xlvi) was passed, unopposed. Acts of the Parliaments of the United Kingdom Part 106 (1896a), c.xlv : Cawood Wistow and Selby Light Railway, www.opsi.gov.uk Construction began on 11 July 1896, following the ceremonial cutting of the first sod at Cawood, performed by Mrs Liversidge, the chairman's wife. A rail connection near Selby was built in September of the same year to allow construction materials to be brought. The single track line opened on 16 February 1898Opening day Howdenshire History with the company's sole locomotive Cawood hauling their two coaches plus five from the NER from Brayton Gates to Cawood then back to Wistow where lunch was served in the schoolroom. The NER did not allow through passenger running onto their metals, so the CW&SLR built a single platform halt next to Brayton Gates junction, about from the main station. This was satisfactory for people visiting Selby town centre, but inconvenienced through travellers.

In 1899 the company's board of directors decided to pursue building an extension west from Cawood to Church Fenton. No clear junction with the railway there was specified, but the effect, deliberate or otherwise, was to unnerve the , who saw a potential threat should the Cawood line revive a venture along the lines of the 1879 scheme, which would allow the Hull and Barnsley Railway to penetrate the NER's fiefdoms of York and Harrogate. The NER responded by buying the Cawood company for £32,000. The sale was fully effective from 1 January 1900 and confirmed by the North Eastern Railway Act 1900 (63 & 64 Vict. c. clxii) of 30 July 1900.The North Eastern Railway; its rise and development, William Weaver Tomlinson, 1915, p.778, Appendix E, online version via www.archive.org The NER decided not to proceed with the extension to Church Fenton. The Cawood company was formally wound up on 27 February 1900, having, unusually for such ventures, paid a dividend to shareholders throughout its short life. Thereafter the NER operated the line as a branch, as did its successors, the LNER then finally the North Eastern Region of British Railways. An early passenger benefit from the NER's takeover occurred on 1 July 1904 when Cawood branch trains were diverted to run through to the main station. The Brayton Gates terminus thereby became redundant. It was closed and soon demolished.

The passenger service was withdrawn on 1 January 1930, but a goods service continued.Wistow station and train Flickriver A "Farewell" railtour ran on 22 April 1960 using two brake vans.Special train at Cawood Six Bells Junction Another party of enthusiasts was carried in the same month. The line closed on 2 May 1960. The very last train, sent out to collect a stranded van and Cawood station's office equipment, ran on 23 May 1960, hauled by a diesel shunter. As a boy, Mr John Woodall had travelled on the first train in 1898, British Railways agreed to his request to travel in the guard's van of this final trip.

Operation The line was called a "Light Railway", but it was authorised before the Light Railways Act 1896, so it received none of the benefits of that legislation. It was soundly built as a "heavy" line, but with a route availability of "two", which severely restricted the axle weight of locomotives and rolling stock which could be used. Being almost dead level and single track throughout, with a terminus at the country end, the line lent itself to one engine in steam working. The route had just one signal of its own – a fixed distant on the approach to the junction with the main line – and needed no signalboxes. Traffic passing to and from the NER was controlled by that railway using signals of their own on Cawood line territory. For this the NER used what was "Brayton Gates" signalbox, which was subsequently renamed "Wistow Junction" and in 2018 remained operational as "Selby West" signalbox.Selby West signal box over the years Google Images The line had seven gated level crossings and eight sets of sidings, five near level crossings, one each at Cawood and Wistow stations and exchange sidings at Brayton Gates. The loading banks next to sidings at Cawood and Wistow were long and had sections of different heights for loading and unloading different consignments. Four of the level crossings had gatekeeper's cottages with bay windows to observe the track in both directions, the two country stations' buildings were similar to each other, but differed from the NER's rural station style. By 2005 three crossing keepers' cottages survived, with the one at Broad Lane, Cawood being externally the least altered. The line had no overbridges and two underbridges, one crossed the Black Fen Drain, the other was the line's only engineering work of any note – a plate girder bridge over the Selby Dam, which, despite its name, is a small river.Selby Dam on local map Streetmap The line was relaid and the stations repainted in 1953, but local hopes of an upturn in fortunes came to nothing.

The line's initial passenger timetable provided five trains a day, Monday to Saturday, plying between "Selby" (i.e. Selby (Brayton Gates)) Wistow and Cawood. The journey time was 17 minutes. By July 1899 the timings had been adjusted and one train had been removed on Tuesdays to Saturdays. On Monday – Selby's Market Day – an extra train was provided out and back mid-morning and an extra from Brayton Gates at teatime, which returned empty. By 1910 the unbalanced teatime Market Train had been withdrawn and timings had been adjusted, but the pattern of four a day plus a Market Day extra remained, with the added benefit that the first train from Cawood in the morning ran through to York. The journey time remained 17 minutes despite the extra to reach Selby's main station instead of Brayton Gates.

By 1914 there were two Market Day extras and four daily trains, but by 1923, whilst the Market Day extras remained, only two daily trains survived, morning and mid-evening. Passenger traffic was encouraged on occasions such as cheap tickets to visit the Wistow Show and Sports day.

The CW&SLR had two coaches and one locomotive, an 0-6-0ST built by Manning Wardle, named Cawood.Railways in East Yorkshire, Martin Bairstow, 1990, "The Cawood, Wistow & Selby Light Railway", p.66 All three items were hired from the Yorkshire Railway Wagon Company (YRWC) for seven years from April 1897. The loco was housed in a single-track engine shed at Brayton Gates. Apart from being referred to as "First and Third Class composite coaches" photographs and details of the coaches have evaded historians. The company hired "wagons, sheets and ropes as may be required" from the NER.

When the NER took over they inherited the hire of Cawood and the coaches. The company arranged to return them to the YRWC in summer 1901. The coaches' fate is not known, but the loco had a varied and useful life until at least 1927. The next twenty nine years of passenger working appears quixotic, but it was ultimately dictated by the line's very low route availability, mainly caused by the Selby Dam bridge. The NER had no problem with providing very low axle-weight goods locomotives, but very light locos fitted with continuous brakes and reasonably capacious water tanks were rare. The first solution was to use NER class H2 (LNER class J79) 0-6-0T No. 407.The J79 locos and their classmates LNER Encyclopaedia This loco, one of a class of three, was a six-coupled development of the successful NER Class H 0-4-0T, two of which have survived into preservation. At some point No. 407 was fitted with extended tanks for use on the Cawood branch, as the line's only watering facility was a hand pump at Cawood. Three other tank engines were fitted with Westinghouse continuous brakes and moved to Selby engine shed – sister "H2" No. 1787 from 1905 to 1909 and NER Class E 0-6-0Ts Nos. 296 and 1197 from around 1908; these last are known to have worked the Market Day extra trains for several years.

In 1903 the NER introduced Petrol-electric Autocars on some lightly-used routes. After considerable development work two of them – Nos. 3170 and 3171 – moved to Selby in summer 1908 to work passenger trains on the Cawood branch, among other services. In 1909/10 four seats were taken out of both cars to enable the luggage compartments to be enlarged. The cars were driven by "Motormen" and housed from 1912 in a specially-built lean-to shed attached to the locomotive coaling stage at Selby engine shed. Remarkably, this structure survived until the shed as a whole was demolished in 1964. Use of Autocar No. 3171 appears to have faded from the early 1920s, with long periods in store. In 1923 No. 3170 was re-engined, renumbered as 3170Y and sent to work in the Harrogate area, but this lasted only for the 1923 summer season, after which there is no published evidence of it being used until it was withdrawn in 1931. Remarkably, No. 3170 was discovered in the early 21st century, having been used as a holiday home near Kirbymoorside for 70 years. It was bought in 2003 with a view to restoration and ran under its own power on the Embsay and Bolton Abbey Steam Railway in 2018.

When the autocars ceased working the line reverted to steam haulage, with trains composed of a single "Bogie Brake third" coach worked by a NER Class E 0-6-0T or, occasionally, BTP 0-4-4T No. 189.

On 9 July 1923 a quite different form of internal combustion-powered provision was deployed on some services in the form of the unique "Leyland" petrol railbus, a converted 26-seater NER road bus of conventional appearance for the period.The LNER petrol rail bus LNER Encyclopaedia This ran a wide-ranging diagram including the Cawood branch which came to a sudden end on 11 November 1926 when the railbus was destroyed by fire while refuelling at Selby.

The immediate hiatus was filled by a combination of BTP tank locos and a "steam autocar". Research continues as to what form this took.