The Point Aconi Generating Station is a 165 MW Canadian electrical generating station located in the community of Point Aconi, Nova Scotia, a rural community in the Cape Breton Regional Municipality. A thermal generating station, the Point Aconi Generating Station is owned and operated by Nova Scotia Power Corporation. It opened on August 13, 1994, following four years of construction.

The Point Aconi Generating Station is situated on the shores of the Cabot Strait at the northeastern tip of Boularderie Island, located approximately west of the headland named Point Aconi and east of the headland named Table Head. Its civic address is 1800 Prince Mine Rd, Point Aconi, NS. The facility is located at the northern terminus of Prince Mine Rd – Highway 162.

Unlike the nearby Lingan Generating Station which has four generating units, Point Aconi has only one. The Point Aconi unit, however, is the largest producing unit in Nova Scotia and is also the province's newest. The facility is able to produce 165 MW and, unlike the vast majority of Canadian coal-fired power plants, uses circulating fluidized bed (CFB) to reduce emissions of NOx and SO2.

Point Aconi was the world's largest CFB plant—and the first to enter commercial service in North America—when it came on-line in 1993. Tokyo-based Mitsui & Co., Ltd. was the turnkey contractor for Point Aconi; Sargent & Lundy was the project's architect/engineer.

Development The Seaboard Generating Station opened in Glace Bay in 1931 by Dominion Steel and Coal Corporation and was the sole supplier of electricity for the Industrial Cape Breton region until its purchase by Nova Scotia Power in 1966 as part of DOSCO's ongoing asset liquidation. Nova Scotia Power opened the province's largest generating station, the Lingan Generating Station, at the height of the 1979 energy crisis to take advantage of relatively cheap Cape Breton coal being produced by the Cape Breton Development Corporation (DEVCO).

The idea of replacing the aging Seaboard Generating Station was discussed during the 1980s and was an important promise by the incumbent Progressive Conservative Party led by Premier John Buchanan during the 1988 provincial election. After Buchanan's government was returned to power, Nova Scotia Power issued a call for proposals in October 1988 to construct a 150 megawatt CFB (Circulating Fluidized Bed) coal-fired electrical generating station in Point Aconi.

Significant controversy dogged Buchanan's election promise to build a new generating station as the Public Utility Board had authority to decide on all applications by Nova Scotia Power to construct new generating stations as well as associated rate increases. The PUB began to conduct hearings into the project in spring 1989 and stated that an economic analysis of Buchanan's election promise (the $500 million Point Aconi Generating Station) was not required as the province's generating needs were met by current sources. Coincidentally, Nova Scotia Power had also promised to purchase electricity from small independent power producers in the province beginning in 1990, however this agreement was abolished after the Small Private Power Association of Nova Scotia intervened at the PUB hearings to block the proposed Point Aconi Generating Station. On April 27, 1989, Buchanan introduced a controversial amendment to the Public Utilities Act, which would remove the requirement for Nova Scotia Power to submit proposals for new generating station to the PUB. Hearings into the Point Aconi project were cancelled after the amendment to the Public Utilities Act receiving royal assent in early June 1989."Buchanan short-circuits N.S. utilities board with power plant bill." The Globe and Mail, Thursday, April 27, 1989

Request for proposals In early January 1990, Nova Scotia Power announced that the Japanese industrial conglomerate Mitsui had won the Request for Proposals (RFP) that had been issued in fall 1988 and a contract was signed on behalf of the Government of Nova Scotia. The proposal detailed a turnkey project designed by Mitsui with the CFB steam boiler supplied by Pyro-Power through Kamtech Services (a subsidiary of Lauren Engineers & Constructors of Abilene, Texas), project management and engineering by Chicago-based Sargent & Lundy LLC, and construction of the plant itself by Jones Power Corporation.

Public hearings Two weeks later, the provincial government announced that its Environmental Control Council would conduct a one-day hearing into the project on January 18, 1990, in place of the PUB hearings conducted the previous spring which were aborted as a result of the amendment to the Public Utilities Act. The hearing received submissions from citizens and organizations that were strongly opposed to the Point Aconi Generating Station, pointing out the environmental impact, that its generating capacity wasn't required, and that it was a political mega-project that would add to the financial debt of the publicly owned Nova Scotia Power Corporation.

Other submissions from citizens and organizations were supportive of the project, which they claimed would create an estimated 500 construction and operating jobs, as well as theoretically guarantee work in Cape Breton's coal mines; the United Mine Workers of America Local 26 had lobbied hard for the power plant. Richie Mann, the environment critic for the official opposition Liberal Party asked at the one-day hearing, "Can you give us some evidence that this process is not an exercise in public relations, a sham?"Kevin Cox "Panel asked to show evidence power plant hearing not 'sham'." The Globe and Mail, Friday, January 19, 1990

On Friday, March 9, 1990, the provincial government announced its approval of the estimated $436 million project, even though it had already signed a contract with Mitsui two months earlier. Nova Scotia's Environment Minister John Leefe defended the projected 1.5 million tonnes per year of carbon dioxide emissions, stating "[The project will be] absolutely inconsequential in terms of global carbon dioxide production."

Nova Scotia Power pointed out the environmental benefits of the Point Aconi project, stating that the use of CFB technology whereby limestone would be used to filter out sulphur dioxide (SO2) and nitrogen oxide (NOx) which were major contributors to acid rain. Minister Leefe stated that Nova Scotia Power intended to reduce SO2 emissions from its generating stations to 100,000 tonnes a year by 2010 from the 1990 level of 160,000 tonnes. Minister Leefe also noted that while the use of CFB technology would reduce acid rain, it would also result in a comparatively massive increase in carbon dioxide (CO2) emissions which was a greenhouse gas; Leefe told reporters that Nova Scotia's coal-fired plants contributed 32 per cent of the 18 million tonnes per year of CO2 emitted by the province (as of 1990).

The projected increase in Nova Scotia's CO2 emissions as a result of the Point Aconi Generating Station (an estimated additional 1.5 million tonnes per year) went against a recent (1990) decision by federal and provincial energy ministers to reduce emissions of the gas by at least 20 per cent by 2005.

The debate over construction of the Point Aconi Generating Station took place in the shadow of a much larger global debate over acid rain and its contributing factors, such as fossil fueled generating stations. The acid rain controversy resulted in the Canada-United States Air Quality Agreement which was signed by both countries on March 13, 1991, and stipulated that both countries would agree to reduce emissions of sulphur dioxide (SO2) and nitrogen oxide (NOx).

Full federal environmental review rejected On September 20, 1990, federal Minister of Fisheries and Oceans Bernard Valcourt rejected a full environmental review of the project, arguing that any problems to the environment would be relatively minor. Valcourt justified this decision by referring to a scientific report on the project conducted by the Department of Fisheries and Oceans which stated that use of CFB technology could be mitigated. It noted, however, the widespread concern of local residents over the effect of the generating station's draw on ground water supplies (CFB requires large amounts of fresh water) as well as ash discharge and CO2 emissions. The DFO scientists noted widespread mistrust of the provincial government's decision and that the controversial one-day hearing in January left the impression "of a cooked-up deal between the province and federal government to slip this project by without a fair assessment of its potential dangers. In fact, problems are relatively minor... Point Aconi is in some respects a model."Kevin Cox "Ottawa rejects full review of power station's effects." The Globe and Mail Friday, September 21, 1990

On December 13, 1990, lawyers for Greenpeace, the Ecology Action Centre and six property owners who live near Point Aconi argued in the Federal Court of Canada that Valcourt had made a legal error in rejecting a public environmental review panel and that federal Environmental Assessment Review Panel guidelines should be followed to institute a formal review of the $436 million project. Mr. Justice Andrew MacKay ruled against the application on Friday, January 18, 1991, by stating that the Department of Fisheries and Oceans acted in accordance with the law in deciding not to order a full environmental assessment of the project. MacKay noted that the project has resulted in substantial testing of ground water around the plant. He also noted that because there are no standards for CO2, it was impossible to say that the plant would create a pollution problem with its massive CO2 emissions.Special to the Globe and Mail "Lawyer contends minister erred in coal plant ruling" The Globe and Mail Friday, December 13, 1990

A citizens liaison committee was established by Nova Scotia Power to review the project. Current (2010) Member of Parliament for Sydney—Victoria, Mark Eyking whose family operated several farms on Boularderie Island near Point Aconi was a member of this committee at that time and had questions about how emissions from the plant or ground water withdrawn for it would affect his crops or how losses would be compensated, stating, "We see all these little mistakes happening and we know we're going to get dumped on. But when we ask for a neutral party to look at this, Nova Scotia power brings in its big shooters and they knock us down like pegs. Now it's almost too late but people won't sit down and take this any more."Kevin Cox "Power but no glory in Point Aconi" The Globe and Mail Saturday, March 16, 1991

In addition to the estimated $436 million cost for the generating station, the project also included construction of a $150 million transmission line running for from Point Aconi to Halifax. Several property owners along the proposed route rejected offers by Nova Scotia Power to purchase their land, citing the physiological effects of the electromagnetic field from transmission lines. Additional controversy occurred when it was determined that the proposed route would disturb a great blue heron colony, which brought angry responses from members of the Mi'kmaq Nation.Kevin Cox "Power plant ruffles more than feathers" The Globe and Mail Saturday, July 6, 1991

Mitsui formed Mitsui & Co. (Point Aconi) Ltd. as an extraprovincial corporation in another province on December 1, 1989, as a result of its RFP submission. Mitsui & Co. (Point Aconi) Ltd. was registered in Nova Scotia on February 12, 1990, after the contract was signed with Nova Scotia Power in early January.

Construction