This is a list of electricity-generating power stations in the U.S. state of South Carolina, sorted by type and name. In 2024, South Carolina had a total summer capacity of 24.7 GW through all of its power plants, and a net generation of 100,485 GWh. In 2025, the electrical energy generation mix was 54.1% nuclear, 21.5% natural gas, 17.3% coal, 3.2% solar, 2.4% hydroelectric, 1.5% biomass, and 0.1% petroleum.
South Carolina is the nation's third largest producer of nuclear power, with four nuclear plants. Natural gas has been the most rapidly growing source of generation; quadrupling over the decade starting 2010. Data from the U.S. Energy Information Administration serves as a general reference.
Nuclear power stations PlantLocationCapacity(MW)YearopenedRefs Catawba Nuclear Station 2,310 1985 (Unit 1 - 1160MW)1986 (Unit 2 - 1150MW) H. B. Robinson Nuclear Generating Station 741 1971 Oconee Nuclear Station 2,554 1973 (Unit 1 - 847MW)1974 (Unit 2 - 848MW)1974 (Unit 3 - 859MW) Virgil C. Summer Nuclear Generating Station 971 1984
Fossil-fuel power stations
Coal Name Location Coordinates Capacity(MW) Coal type Yearopened Operational/closure date Refs Canadys Station Colleton County 490 1962 (Unit 1 - 136MW)1964 (Unit 2 - 136MW)1967 (Unit 3 - 218MW) Closed2012 - Unit 12017 - Units 2 & 3 Cope Station Orangeburg County 430 1996 (Unit 1) OperationalCoal use to cease in 2030 Cross Generating Station Berkeley County 2,390 1984 (Unit 1 - 556MW)1995 (Unit 2 - 591MW)2007 (Unit 3 - 591MW)2008 (Unit 4 - 652MW) Operational Jefferies Generating Station Berkeley County 346 1970 (Unit 1 - 173MW)1970 (Unit 2 - 173MW) Closed - 2012 Wateree Station Richland County 772 1970 (Unit 1 - 386MW)1971 (Unit 2 - 386MW) OperationalPlant to close in 2028 Williams Station Berkeley County 633 1973 (Unit 1) OperationalPlant to close in 2028 Winyah Generating Station Georgetown County 1,260 1975 (Unit 1 - 315MW)1977 (Unit 2 - 315MW)1980 (Unit 3 - 315MW)1981 (Unit 4 - 315MW) OperationalTwo units to close by 2023Two units to close by 2027 Units 2 and 3 were originally planned to be converted to natural gas as an interim step to closure, but those plans were abandoned. Fueled by mix of coal and natural gas Units 3 and 4 are permitted to fire up to 30% petcoke by weight on either boiler.
Natural gas PlantCountyLocationCapacity(MW)YearopenedRefs Columbia Energy Center Calhoun 543 2004 Jasper Jasper 852 2004 John S. Rainey Generating Station Anderson 460 2001 Urquhart Aiken 452 2002 W.S. Lee Steam Station Anderson 890 2018
Renewable power stations
Biomass
Name Location Capacity(MW) Yearopened Florence Mill 98.8 1963/1974/1987 International Paper Eastover 103.0 1984/1991 International Paper Georgetown Mill 80.4 1966/1984 Kapstone 85.0 1999 Marlboro Mill 34.2 2010 Sonoco Products 38.0 1947/1957
Hydroelectric
Name Location Capacity(MW) Yearopened Hartwell Dam 421 1962 J. Strom Thurmond Dam 361.9 1953/1954 Jefferies Hydroelectric Station 145.2 1942 Parr Hydro 15.0 1914/1921 Richard B. Russell Dam power plant 300 1985 Saluda Dam 207.3 1996
Solar
Name Location Capacity(MW) Yearopened Centerfield Solar 75.0 2020 Moffett Solar 69.5 2017 Palmetto Plains 75.0 2019 Peony Solar 39.0 2018 Seabrook Solar 72.5 2019 Shaw Creek Solar 74.9 2019
Storage power stations
Pumped storage Name Location Capacity(MW) Yearopened Bad Creek Hydroelectric Station 1,060 1991 Fairfield Pumped Storage 576 1978 Lake Jocassee Power Station 780 1973/1975 Richard B. Russell pumped storage 300 1996
See also
List of power stations in the United States List of pumped-storage hydroelectric power stations
References