McGregor station is on the Canadian National Railway mainline in McGregor, British Columbia. Via Rail's Jasper – Prince Rupert train calls at the station as a flag stop.
History
The Lund-Rogers Construction Company ran camps at the previously designated Miles 186 and 187,Fort George Herald: 8 Jun 1912 & 17 May 1913 with the former as headquarters.Fort George Herald: 28 Sep 1912 The Grand Trunk Pacific Railway (later the CNR) Hansard Bridge spans at Mile 99.1, Fraser Subdivision (formerly about Mile 188.5, though a contemporary article inadvertently quoted the camp location).Fort George Tribune, 9 Aug 1913 The low-level railway bridges at Dome Creek and this crossing curtailed the previous steamboat navigation, which triggered a response from the Barnard steamboat management.
Foley, Welch and Stewart, the prime contractor, operated on a cost plus basis. Russell R. Walker (1888–1973),Prince George Citizen: 6 Oct 1978 & 23 Feb 2002 a photographer of the era, observed tunnel work opposite Hansard on the north bank of the Fraser just west of the railway bridge. He suspected graft and corruption because it was nowhere near where the mainline would run.Prince George Citizen, 14 Nov 1966 In a similar vein, William (Bill) Bellos (c.1887–1989),Prince George Citizen, 26 Jul 1989 a construction worker at the time, mentions a tunnel cave-in at the faraway McGregor River, which is west beyond McGregor on the north bank.Prince George Citizen, 27 Jan 1984
The enforced liquor ban ensured sedate and sober camp conditions.Fort George Herald, 20 Sep 1913 In June 1913, flooding from the river forced the temporary evacuation of buildings at Camp 186.Fort George Herald, 21 Jun 1913 The Bates & Rogers Construction Company was contractor for the bridge substructure (piers and abutments) and the Canadian Bridge Co. for the superstructure (steelwork). By August, pile driving for the piers was in full swing and two steam shovels were excavating the bridge approach on the northeast bank. A temporary wooden trestle would carry the track until the steel bridge's completion. With track laying at a day, a completed trestle and the arrival of the railhead were optimistically predicted by October 1.Fort George Tribune, 13 Sep 1913 Slicing through the piles, floating ice destroyed 12 lengths of the temporary trestle. With the railhead almost at this point in early December, this destruction delayed progress until the river froze over.Fort George Herald: 26 Nov 1913 & 3 Dec 1913 While on leave with fellow workers from the Bates & Rogers camp at Christmastime, Harry Porter (c.1873–1913) met George Onooki (c.1890–1914), a former co-worker from Mile 160. The ensuing brutal assault of Porter was South Fort George's first murder. The motive robbery, Onooki was sentenced to hang.Fort George Herald: 31 Dec 1913, 14 Jan 1914 & 23 May 1914
Plans for a separate vehicle deck on the bridge never proceeded and the Eaglet Lake Lumber Co. purchased the surplus steel girders in 1916. High water levels during the 1936 spring floods left very little clearance for driftwood to pass beneath the bridge deck.Prince George Citizen, 4 Jun 1936 A guard, who was presumably armed, defended the crossing during World War II.Prince George Citizen: 8 & 22 Oct 1942; & 8 Apr 1943 When the sun buckled rail lines to the east during 1944, six gravel cars derailed.Prince George Citizen, 15 Jun 1944
McGregor flag stop lies at the eastern end of the Hansard Bridge. The former community was just east at Mile 98.5.
Service c.1959–1965 1965–1977 1977–c.1981 c.1982–c.1989 c.1990–c.1993 c.1994–present Mile No. 98.3 1960 Timetable. Northern BC Archives1964 Timetable. Northern BC Archives 98.4 1965 Timetable. Northern BC Archives1967 Timetable. Northern BC Archives1968 Timetable. Northern BC Archives1972 Timetable. Northern BC Archives1973 Timetable. Northern BC Archives 98.9 98.5 1990 Timetable. Northern BC Archives1992 Timetable. Northern BC Archives Recent timetables Passenger Flag stop Flag stop Flag stop Flag stop Flag stop Flag stop Way freight Flag stop Flag stop
Whether the flag stop was not clearly defined, or actually moved, is unclear. Initially called Church Sawmills from the late 1950s, it became Sinclair Spruce Mills from 1965, then Northwood Timber Ltd. 2 from 1973, and then McGregor by 1976.
Footnotes
References
External links Via Rail Station Description