The Lysekil project is an ongoing wave power project which is run by the Centre for Renewable Electric Energy Conversion at Uppsala University in Sweden. It is located to the south of Lysekil, Västra Götaland County, on the west coast approximately north of Gothenburg. there were 11 wave energy converters (WECs) located on the site, with a total capacity of 260 kW.

Introduction The main characteristic of the interaction between waves and a WEC is that energy is converted at large forces and low velocities due to the characteristic of ocean waves. As conventional generators are designed for high speed rotational motion, traditional wave power take-off system use a number of intermediate steps, for example hydraulics or turbines, to convert this slow-moving wave motion making it suitable for these generators.

Another way to tackle the problem; instead of adapting the waves to the power-take off system is adapting the system to the waves. This can be done by using a direct driven WEC (wave energy converter) with a linear generator. The advantage with this setup is a less complex mechanical system with potentially a smaller need for maintenance. One drawback with this kind of system is a more complicated transmission of the power to the grid. This is due to the characteristics of the generated voltage which will vary both in amplitude and frequency.

In the Lysekil project one goal was to develop a simple and robust wave energy system with a low need for maintenance. The approach was to find a system with few moving parts and as few energy converting steps as possible. Because of these requirements, a concept with a direct driven permanent magnet linear generator driven by a buoy that follows the motion at the sea surface was chosen.

Purpose of the project The Lysekil research project was established with the purpose to evaluate the chosen concept. The behavior of the WEC is studied both when it works as a single unit and together with several other WECs as a part of a cluster. Other important aspects are the design of the transmission system, in other words, how the power is transported to the grid and how this affects other part of the system, such as the buoy absorption. Another purpose with the project is to determine the WEC's environmental impact focusing on marine organisms, ranging from small bottom dwelling organism living in the seabed, from organism involving in biofouling to vertebrates.

Lysekil Research site The test site is located on the Swedish west coast about north of Gothenburg, close to Lysekil. The site is located offshore and covers an area of . The seabed in the area has an even surface with a slight incline towards west and the depth ranges from in the eastern part to in the west. The seabed consists mainly of sandy silt and some smaller areas are also covered with rougher material. The area will contain ten buoys connected to generators and an additional numbers of buoys for environmental impact studies. The permits allow the studies to go on to the end of 2013, then all equipment has to be removed unless a prolongation is applied for and approved.

The average energy flux at the research site during 2007, excluding August, was 3.4 kW/m. The most frequent sea state is characterized by an energy period, TE, around 4 sec and significant wave height Hs less than . The main energy contribution comes from the more energetic (but not that frequent) sea states.

Concept

The wave power concept in the Lysekil project is based on a three phase permanent magnetized linear generator placed on the seabed. The generator is connected to a point absorbing buoy at the surface via a line. When the waves move the hydrodynamic action forces the buoy to move in a heaving motion. The movements of the buoy will then drive the translator in the generator, consequently inducing current in the stator windings. The translator is connected to the generator foundation with springs that retract the translator in the wave troughs.

The technology of the linear generator is assumed to be somewhat independent of the depth and the unit size of 10 kW is assumed to match a significant wave height in the range of . The generator and the mechanical structure around the generator are however designed to be able to handle large overloads in terms of electrical and mechanical strain. In table 1 rating and geometric data of the first experimental WEC is shown.

Rating and geometry data of WEC Rated power generator 10 kW Line-to-line voltage generator 200 V Nominal current 29 AStator length 1250 mmTranslator length 1850 mmTotal stroke length 2190 mmFree stroke length 1800 mm Height buoy 0.8 m Diameter buoy 3 m Draft at normal water level, buoy 0.4 Weight buoy 1000 kg

Because the induced voltage will vary both in amplitude and frequency the generated power cannot be directly transmitted to the grid. Hence several WECs will be connected to a marine substation, where the voltage from each WEC will be rectified and the combined output alternated and transformed before connection to the grid. The sea cable that is used is a 1 kV cable with 4 x 95 mm2 copper conductors with a resistance at 0.5 Ohm per phase.

Project history

The Lysekil project started in 2002 at the Division for Electricity at Uppsala University. Simulations indicated that there was a potential for harvesting energy with a wave power farm consisting of a number of smaller WEC units in coastal areas. The simulations did also point out the possibility for electrical power production in places with moderately calm seas. Due to these simulations being based on simplified buoy-wave interaction models, further simulations and experimental verifications where needed.

During 2003 and 2004 permits to establish the Lysekil Research site were obtained and the first wave measuring buoy was deployed in 2004. The first experimental setup was deployed in March 2005 and the purpose was to measure the maximum line force from a buoy with a diameter of and a height of . This set up simulated a generator that had been disconnected from the grid and thereby operating without any damping in the system. The results from these experiment were used as input data to the first wave generator and to verify the calculations of the dynamics of non-damped systems.

Since the deployment of the first WEC in 2006, it has been in operation in real ocean seas for several months during three different time periods. During these periods measurements of electrical power, buoy motion and mooring line forces have been carried out and analyzed to enhance the knowledge about direct driven linear generator WEC dynamics. In the first test period all electrical power was converted to heat over a three phase delta-connected resistive load. To investigate the impact of a non-linear load on the WEC system, the generator was, during the second test period, connected to a non-linear load consisting of a diode rectifier, capacitors and resistors. The control, load and measurement system for the WEC have successively been expanded and now there is a remotely operated measurement system and control system.

Results from the studies demonstrate how well wave energy converting with this concept functioning in calm as well as rough offshore sea states. Experiments with non-linear loads have increased the knowledge about how the transmission system should be designed. The results also show how the WEC operates when connected to a non-linear load which will be the case when the generated voltage rectifies.

The Lysekil Project has been enlarged with two additional WEC which have been launched in the test site together with a marine substation. These three WEC have recently (June 2009) been interconnected with the substation.

In November 2015, the test site was connected to the electricity grid. A further two WECs were then installed in 2017.

Technology

Linear generator The moving part in a linear generator is called the translator. When the buoy is lifted by the wave, the buoy sets the translator in motion. It is the relative motion between the stator and the translator in the generator which causes voltage to be induced in the stator windings.

The requirement on a linear generator for wave power applications is the ability to handle high peak forces, low speed and irregular motion at low costs. When a generator moves with varying speed and direction it results in an induced voltage with irregular amplitude and frequency. The output power's peak value will be several times higher than the average power production. The generator and the electrical system has to be dimensioned for these peaks in power.

There are different kind of linear generators which could be used in wave power applications and at comparison it has been found that permanent magnetized synchronous linear generators is the most suitable type. In the Lysekil project this type of generator has been chosen and the magnets are Nd-Fe-B permanent magnets mounted on the translator. Inside the generator powerful springs are fastened underneath the translator, they act as a reacting force in the wave troughs after the buoy and translator being lifted by the wave crests. The springs also temporarily store energy which results in allowing the generator, optimally, to produce an equally amount of energy in both directions, evening out the produced power. In the top and bottom of the generator end stops with powerful springs are placed to limit the translator stroke length.

Transmission system The power produced cannot, as earlier mentioned, be directly delivered to the grid without conversion. This is done in several steps; firstly the voltage is rectified from each generator. Then they are interconnected in parallel and the DC voltage is filtered (the filter consist of capacitors). The filter smooths out the voltage from the generators and creates a stable DC voltage. During short periods of time, the power after the filter will also be constant. If the system is studied during hour-scales (or more) there will be variations in the produced power, these variations is due to changes in the sea state.

This buoy-generator concept does not allow a single unit to be operated, especially not connected to the grid. This is mainly due to the large short term variations in produced power and the relatively small size of the WEC. The cost for the electrical system, the transmission system, would be too high. When several generators are connected in parallel the demand on the ability of the capacitive filter to store energy will decrease and hence also the cost associated with it. To compensate for voltage variations on the output that occur due to sea state variations, a DC/DC converter or a tap-changed transformer can be used.

System aspects A high level of damping (power extraction) results in bigger difference between the vertical motion of the wave and the speed of the translator. This will in turn result in a higher line force when the wave lifts the buoy and a lower force when the buoy moves downwards. The maximum power occurs during the maximum and minimum line forces (assumed the translator is within generator stroke length). If the translator moves downwards with a lower speed than the buoy the line will slacken and the resulting line force becomes almost zero. The reverse relation occurs when the buoy moves upwards, then the line force becomes larger the bigger difference there is between the motion of the buoy and the generator translator.