The Xijiao Line of the Beijing Subway, also called Line 29 (), is a light rail line in Haidian District of Beijing. It runs southeast-northwest from Bagou station on Line 10 to the Fragrant Hills station, marking a total length of . It entered service on December 30th, 2017. The line is operated by Beijing Public Transit Tramway Co. Ltd. a subsidiary of Beijing Public Transport Holdings, Ltd. which also operates Beijing's Buses.
Fares
The Xijiao Line, despite being situated in the suburbs of Beijing, still constitutes as the city's public transportation; hence, it uses the same fare system as other subway lines. Ticket prices for the first 6 kilometers on the line (inbound up to the Summer Palace West Gate station, outbound up to the Wan'an station) are 3 RMB, though it rises up to 4 RMB for the rest of the route (inbound to the Bagou station, outbound to the Fragrant Hills station).
In-station transfer is, however, not available at the inbound terminus of Bagou. Passengers would need to exit the station after disembarking Line 10, then re-enter to take the Xijiao Line.
History Starting November 24, 2008, construction websites in Beijing began pitching bids for the construction of the 1st phase of the new Xijiao Line.
At the 15th Capital Urban Planning and Construction Design Conference (December 11, 2008), the Beijing City Planning Committee unveiled plans to construct 4 new subway lines for the suburban Fangshan, Shunyi, and Changping districts. The Committee also announced that they would strive to build two of the four lines by 2010.(Chinese) Zhang, Nan and Meng Huan, "西郊线通往香山两年内有望开通" 北京晚报 11 December 2008 One of those lines was eventually nominated the Xijiao Line.
On January 6, 2009, the Haidian District government announced that they would begin construction of the Xijiao Line that very year, though engineering details such as the exact route, whether the line would be below grade or above the surface, and the number of stations, were still being decided.(Chinese) "2009年北京将开工5条地铁线 10号线向西延至香山" 中国网 6 January 2009. By the 15th, the City Planning Committee unveiled the first five stations along the route.(Chinese) "北京地铁西郊线确定设五站" 新京报 15 January 2009 By August of the same year, authorities changed plans for the Line, adapting it from a metro to a tourist tram line with an operating speed of . The new project planned of rail, under a total estimated cost of 1 billion RMB.
The recommencement of construction was set for 2010,(Chinese) "北京地铁7号线、14号线、S1线及西郊线年内开工" 7 January 2010 but it was not until March 14, 2012, that the new route map and planning program were announced. Actual construction lasted five more years, finishing on October 20, 2017. Trial operations begin afterwards accordingly.(Chinese) "最美西郊线全面试运行 赏红出行将享交通新干线" bjbus.com 2017-10-20 By December 30th, the Xijiao Line was ready for use.
Route All stations are located in Haidian District.
Station Name Connections Nearby Bus Stops Distance (in km) 0.000 0.000 0.983 0.983 1.733 2.716 1.550 4.266 1.505 5.771 2.922 8.693
Rolling stock The line uses 31 low-floor 5-segment Hitachi Sirio trams built on license by CRRC Dalian. Single vehicles are normally used but can be coupled to form two-car trains when necessary.
Accidents and incidents On 1 January 2018, tram XJ003 derailed after a malfunction when departing from Fragrant Hills station at 2:36 PM with no passengers on board. The tram slid down the tracks with its control lever still at traction position after being lifted back on to the tracks later that day. Xiangshan station stopped service until 1 March 2018.
The involved set XJ003 was taken out of service since the incident and stored in the Bagou Depot.
References