The Mount Storm Wind Farm is located 120 miles west of Washington, D.C. in Grant County, West Virginia. The wind farm includes 132 Gamesa G80 wind turbines each with a two megawatt (MW) capacity along 12 miles of the Allegheny Front. Construction of the wind farm began in 2006 and the project is now fully operational, generating up to 264 MW of electricity for the mid-Atlantic power grid.Dominion & Shell Complete 264-MW Mount Storm Wind Project
Nedpower Mount Storm, LLC was formed in 2007 as a joint venture between Shell and Dominion Resources,, "Company Overview of Nedpower Mount Storm, LLC","Bloomberg Businessweek" and was acquired by a subsidiary of Castleton Commodities International in 2019.
History Plans for the farm were first announced in 2001, when the U.S. Wind Force filed for a permit with the West Virginia Public Service Commission to build a 166 turbine wind farm, which would have been the largest wind farm east of the Mississippi River. The project's backers hoped that the first turbines would be operational by late 2002 with the rest of the facility coming online in 2003, but opponents quickly raised objections, arguing that the project would threaten birds and diminish home values in the surrounding area.
In May 2002, the Public Service Commission approved the U.S. Wind Force's permit application without any significant opposition. The company also reached an agreement with the AFL-CIO to use union labor in the construction of the facility. At the hearings for the permit, speakers in favor of the project included Walt Helmick, a member of the West Virginia Senate, Jeff Barger, the County Commissioner of Grant County, and Steve White a union leader. A study by the U.S. Fish and Wildlife Service concluded that the project posed little danger to local birds, clearing the way for construction.
In August 2019, Castleton Commodities International announced that it had purchased Nedpower Mount Storm through one of its subsidiaries.
Electricity production
+Mount Storm Wind Electricity Generation (MW·h) Year Total Annual MW·h 2008 222,471 2009 579,436 2010 702,979 2011 654,187 2012 587,120 2013 600,277 2014 604,750 2015 618,493 2016 633,024 2017 566,611 2018 611,330 2019 579,690 Average (2009-2019) 612,536
Turbine Losses (to fire)
(January 16, 2008) (January 7, 2015) (2018 *requires date verification and siting)
See also
Wind power in West Virginia List of wind farms in the United States
References
External links Drone Video Footage of Mount Storm Wind Farm