The Sherbino Mesa Wind Farm is located in Pecos County in west Texas. The first 150 megawatts (MW) of the project, which has a potential capacity of 750 MW, is in operation. Phase I utilizes 50 Vestas V-90 Mk.5 wind turbine generators, each with a rated capacity of 3 MW. BP will operate phase I of the project.BP Starts Full Commercial Operation at Texas Wind Farm

Phase II, located on a site west of Fort Stockton, utilizes 60 Clipper Windpower C-96 wind turbines, each with a rated capacity of 2.5 MW. This phase will be in operation by the end of 2011."BP Begins Construction On Sherbino Mesa II Wind Farm" North American Windpower Apr. 1, 2011.

See also

List of wind farms Wind power in Texas

References