Line 7 of the Beijing Subway () is a rapid transit line in Beijing. It runs parallel and to the south of Line 1 and Batong line, from the Beijing West railway station in Fengtai District to in Tongzhou District. Like Line 6, Line 7 provides additional relief to the overcapacity Line 1 adding another east–west trunk line to the Beijing Subway network. The line uses 8-car Type B trains. Line 7's color is cream.

Stations List of stations from west to east.(Chinese)"Line 7 Information Page" BII accessed Oct. 31, 2008

Station Name Connections Nearby Bus Stops Distance Location 0.0000.000Fengtai0.9350.935Xicheng0.7341.669 (Out-of-system interchange via )1.8743.5431.3744.9170.8855.8021.2057.007Dongcheng / Xicheng0.8697.876Dongcheng1.0168.8921.13810.0301.33211.362Dongcheng / Chaoyang1.24112.603Chaoyang1.31113.9140.78114.6950.86515.5600.90316.4631.46417.9270.90618.8331.67920.5121.30421.8161.02122.8371.67824.5151.75226.2672.51728.7842.96131.745Tongzhou2.11033.8551.16035.0151.19536.2101.42537.6351.76939.404

Planning Line 6 was originally conceived in 1973 as a "pan-handle" shaped route incorporating the central sections of today's Lines 6 and 7. In 1983 Line 6 was dissolved into two distinct lines. The section under Guang'anmen, Luomashi, Zhushikou and Guangqumen Streets and the "handle" branch to Fengtai became Line 7. The rest of the loop with a new south eastern extension to what was at the time the Beijing Jiaohuachang (Coking Plant) complex became Line 6. Line 7 was later revised westward to terminate at a new major railway station called Beijing West railway station and Line 9 taking over servicing Fengtai. When Beijing West railway station started construction in the early 1990s space was set aside for a subway station allowing cross-platform interchange for the future Lines 7 and 9. By 1993 the planned section of Line 6 heading to Jiaohuachang was revised as an eastern extension of Line 7, forming the alignment built today.

Line 7 was originally slated to have 15 stations, from the Beijing West railway station to Baiziwan. A revised plan approved by the Planning Committee of the Beijing Municipal government called for 21 stations over , ending in Jiaohuachang.

In 2013, planners revised the design of Line 7 from using the standard 6 car trains to 8 car trains after performing a detailed transport study of the Fatou area. Fatou's population projections were upgraded from 100,000 to 220,000 people and be a significant employment hub in the future. Planners decided that 6 cars trains would have insufficient capacity for the new demand projections. Line 7 was originally planned to use 1500 V DC overhead lines to power the longer subway trains. However, the already completed platforms at Beijing West railway station assumed the line would use a 750 V DC 3rd rail system like Beijing's legacy subway lines and built with vertical clearance for such. The line ultimately used a 1500 V DC 3rd rail system as a compromise.

On 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) announced the Phase III of Line 7, from Beijing West Railway station to Wanshousi, it will be a 6.4 km long section with 4 new stations. These are confirmed in the tender announcements published on 8 July 2024.

History Phase 1 Construction began in January 2010. Test runs started in September 2014 with full operation beginning on December 28, 2014.

Eastern extension (Phase 2) The eastern extension runs through Chaoyang and Tongzhou Districts. The extension adds 9 new stations and of new line. The extension is fully underground. It was opened on December 28, 2019. station opened on August 26, 2021.

Timeline January 8, 2008: Plans for Line 7 reported in the media. Construction scheduled to begin by the end of the year."Beijing Subway Line 7 and Line 14 will begin construction this year" People's Daily Online Jan. 8, 2008 October 30, 2008: Line 7 route plan with 23 stations receive regulatory approval. Construction still scheduled to begin by end of the year.(Chinese) "北京地铁7号线与14号线方案获批" 京华时报 Oct. 30, 2008 July 19, 2009: Construction on Line 7 announced to begin in late August 2009.(Chinese) Guo, Kun. "北京地铁7号线下个月开工" 京华时报 July 19, 2009 November 6, 2009: Commencement of Line 7 construction deferred to 2010.(Chinese) 北京地铁“南北大动脉”2010底前打通 Nov. 6, 2009 January 19, 2010: Construction reportedly begun along Guangqu Road near the easternmost section of the line.(Chinese) “北京地铁7号线悄然开工 全长23.7公里工期4年” ‘’法制晚报’’ Jan. 19, 2010 December 28, 2014: Operations of Phase I of Line 7 begin, except for Shuangjing station and Fatou station. December 30, 2018: An infill station of Phase I, Fatou station was opened. December 28, 2019: Operations of Phase II of Line 7 begin, except for Universal Resort station. An infill station of Phase I, Shuangjing station was opened. August 26, 2021: Extended to Universal Resort station.

SegmentCommencementLengthStation(s)Name Beijing West Railway Station — Jiaohuachang 28 December 2014 19 Phase 1 Fatou 30 December 2018 infill station 1 Shuangjing 28 December 2019 infill station 1 Jiaohuachang — Huazhuang 8 Phase 2 (Eastern extension) Huazhuang — Universal Resort 26 August 2021 1

Rolling Stock ModelImageManufacturerYear builtAmount in ServiceFleet numbersDepot BD32 Beijing Subway Rolling Stock Equipment 2013 68 07 001–07 068 JiaohuachangZhangjiawan