The Lockheed Martin C-130J Super Hercules is a medium-size American four-engine turboprop military transport aircraft. The C-130J is a comprehensive update of the Lockheed C-130 Hercules, with new engines, flight deck, and other systems.

The C-130J is the newest version of the C-130 Hercules, and the only model currently in production. , 500 C-130J aircraft had been delivered to 26 operators in 22 countries.

Development

On 16 December 1994, Lockheed received the launch order for the J-model from the United Kingdom's Royal Air Force (RAF). The C-130J launch order occurred after a UK government stalemate of several months that concerned whether to buy new transport aircraft from Europe or the United States. It was paired with a commitment to buy 40 to 50 of the proposed European Future Large Aircraft aircraft (FLA, which was later designated as the A400M). The FLA commitment, which reduced the size of the C-130J launch order, was intended to ensure a 20 percent British workshare in the FLA program, and to prevent German industry from threatening British Aerospace's position as the wing manufacturer on the FLA and future Airbus commercial projects. The RAF ordered 25 aircraft for a total fixed price of US$1.6 billion (~$ in ), with first deliveries originally scheduled to begin in November 1996. The promised deliveries of the C-130J allowed the British Ministry of Defence to meet the 1996 deadline for replacing half of the RAF's aging fleet of Hercules aircraft, while the FLA aircraft was not at the time expected to be available until 2003.

To speed up the sale of military and commercial versions of the aircraft, Federal Aviation Administration (FAA) civil certification was pursued before delivery would happen. Civil certification was not a regulatory requirement and was unneeded for the RAF launch order. However, certification was stipulated in Lockheed Martin's contracts with some subsequent customers, including the United States Air Force (USAF) and the Royal Australian Air Force (RAAF).

The program suffered from problems such as software integration glitches that extended the schedule by three months, followed by a nine-month delay caused by undiscovered stall characteristics that required aircraft modification. The stall problem was caused by the additional power of the engines and the increase in propeller blades from 4 to 6, which changed the aerodynamics such that the aircraft had a greater tendency to stall and roll at lower speeds.

Lockheed Martin spent five months making 20 unsuccessful attempts at aerodynamic solutions, but the stall problems were so varied that the fixes it tried to make applied only to specific conditions (such as only during power off, or only at full power). Lockheed Martin changed the cockpit to include a stick pusher, which takes control and automatically pushes down the aircraft's nose if the pilot does not respond to stall warnings. The stick pusher was meant to be a temporary addition until Lockheed Martin could find an aerodynamic fix for all of the new stall conditions.

In late 1997, the company discovered that directional problems could be caused by ice build-ups. Because the AE 2100 engines were more powerful and fuel-efficient than the Allison T56 engines that they replaced, the engines no longer produced enough bleed air to continuously warm the tail. This situation had been anticipated, but the cyclic system that replaced the old de-icing system was found to be insufficient when the C-130J flew in extreme conditions. This problem forced the company to extend the de-icing system higher and lower on the vertical stabilizer to prevent ice formation, causing another delay of five months. These issues resulted in Lockheed Martin exceeding its initial C-130J development budget of US$300 million. By May 1998, Lockheed had spent over US$900 million (~$ in ) in development costs for the C-130J. By the end of 1998, the company owed the RAF about US$50 million (~$ in ) in penalties due to the delivery delays.

FAA type certification occurred in September 1998 following 4,000 hours of flight testing. Deliveries commenced in 1999 as the Hercules C4 (C-130J-30) and Hercules C5 (C-130J). The standard C-130J had a flyaway cost of in 2008."FY 2009 Budget Estimates." United States Air Force via saffm.hq.af.mi, February 2008, p. 81.

On 23 December 2004, U.S. Deputy Secretary of Defense Paul Wolfowitz approved a program budget decision that ended the procurement of C-130J for the Air Force and completed the remaining KC-130J order for the Marine Corps in 2006, which would save US$5 billion in the Pentagon budget. Deficiencies with the C-130J that were cited to support the decision included being unable to drop heavy equipment, the inability to perform combat search-and-rescue missions, cold-weather performance issues, the risk of paratroopers hitting the fuselage when jumping out of the aircraft, major cost increases, and inadequate radar to fly into hurricanes. U.S. Secretary of Defense Donald Rumsfeld reversed this decision on May 10, 2005, after members of Congress stated that canceling the pre-existing orders of 62 total Air Force aircraft over the following five years would result in about US$2 billion (~$ in ) in termination costs to the government, which would have exceeded the cost of buying the aircraft.

In mid-June 2008, the United States Air Force awarded a $470 million (~$ in ) contract to Lockheed Martin for six modified KC-130J aircraft for use by the Air Force and Special Operations Command. The contract led to C-130J variants that will replace aging HC-130s and MC-130s.Trimble, Stephen. "Lockheed Martin C-130J selected for new special operations role." Flightglobal, 18 June 2008. Retrieved 17 July 2010. The HC-130J Combat King II personnel recovery aircraft completed developmental testing on 14 March 2011. The final test point was air-to-air refueling, and was the first ever boom refueling of a C-130 where the aircraft's refueling receiver was installed during aircraft production. This test procedure also applied to the MC-130J Combat Shadow II aircraft in production for Air Force Special Operations Command."HC-130J Completes Developmental Testing." Lockheed Martin Press Release, 22 March 2011.

Harvest HAWK

With the addition of the Marine Corps ISR / Weapon Mission Kit, the KC-130J tanker variant will be able to serve as an overwatch aircraft and can deliver ground support fire in the form of Hellfire or Griffin missiles, precision-guided bombs, and eventually 30mm Mk44 Bushmaster II cannon fire in a later upgrade."General James T. Conway on The Posture of the United States Marine Corps." zumwaltfacts.info, 14 May 2009. Retrieved 1 August 2010. This capability, designated as "Harvest HAWK" (Hercules Airborne Weapons Kit), can be used in scenarios where precision is not a requisite, such as area denial.McCullough, Amy. "Refuel and Fire." Marine Corps Times, 1 June 2009. The aircraft retains its original capabilities in refueling and transportation. The kit can be removed within a day if necessary.Flurry, SSgt Christopher. "KC-130J Harvest Hawk: Marine Corps teaches old plane new tricks in Afghanistan." 2nd Marine Aircraft Wing (Fwd), United States Marine Corps, Camp Dwyer, Afghanistan, 1 April 2011. Retrieved 5 April 2011.

TACAMO

The United States Navy is considering replacing its fleet of E-6B Mercury aircraft with C-130J-30 Hercules aircraft in the Take Charge And Move Out (TACAMO) survivable nuclear communications role. The U.S. Navy's Naval Air Systems Command (NAVAIR) posted a solicitation for fatigue test aircraft to a government procurement website on 18 December 2020. It is to award Lockheed Martin a contract for three "stretched" Hercules in fiscal years 2022 and 2023 for testing and analysis for the TACAMO mission.

Design Externally similar to the classic Hercules in general appearance, the J-model features considerably updated technology. These differences include new Rolls-Royce AE 2100 D3 turboprop engines, Dowty R391 six-bladed composite scimitar propellers that have blade tips swept by 35 degrees, digital avionics (including head-up displays (HUDs) for each pilot), and reduced crew requirements. These changes have improved performance over its C-130E/H predecessors, such as 40% greater range, 21% higher maximum speed, and 41% shorter takeoff distance.Eden 2004. Because of the deicing problem discovered late in the certification program, the C-130J includes a black rubber deicing boot at the bottom of the vertical fin, which is another visual difference from previous versions of the Hercules. The J-model is available in a standard-length or stretched -30 variant.

As a cargo and airlift aircraft, the C-130J's crew includes two pilots and one loadmaster (no navigator or flight engineer), while specialized USAF variants (e.g., AC-130J, EC-130J, MC-130J, HC-130J, WC-130J) may have larger crews, such as navigators/Combat Systems Officers or other specialized officer and enlisted air crew. The U.S. Marine Corps KC-130J uses a crew chief for expeditionary operations. The C-130J's cargo compartment is approximately long, high, and wide, and loading is from the rear of the fuselage.

The aircraft can be configured with the "enhanced cargo handling system". The system consists of a computerized loadmaster's station from which the user can remotely control the under-floor winch and configure the flip-floor system to palletized roller or flat-floor cargo handling. Initially developed for the USAF, this system enables rapid role changes to be carried out and so extends the C-130J's time available to complete taskings.

In 2010, Elbit Systems was awarded a contract to supply its J-MUSIC Directed Infrared Countermeasure (DIRCM) system for integration on the Italian Air Force's C-130J aircraft. J-MUSIC, part of the MUSIC family, uses fiber-laser technology and a high-speed thermal imaging system to protect against heat-seeking missiles, including shoulder-fired MANPADS. This enhancement significantly improves the self-protection capabilities of the C-130J, especially during operations in high-threat environments.

Operational history

The Super Hercules has been used extensively by the USAF and USMC in Iraq and Afghanistan. Canada has also deployed its CC-130J aircraft to Afghanistan.

C-130Js from several countries were deployed in support of the US Operation Odyssey Dawn and NATO's Operation Unified Protector during the 2011 Libyan civil war.

From the first flight on 5 April 1996 to 30 April 2013, 290 C-130J Super Hercules aircraft operated by 13 nations surpassed 1 million flight hours.C-130J Super Hercules Worldwide Fleet Soars Past 1 Million Flight Hours – Lockheed press release, 14 May 2013Israel Receives First C-130J Super Hercules: ‘Shimshon’ – Lockheed press release, 26 June 2013