Summerlin Parkway is a freeway in the western portion of the city of Las Vegas, Nevada. It connects Clark County Route 215 (CC 215) to Interstate 11/U.S. Route 95 (I-11/US 95) and serves the master-planned community of Summerlin. In January 2019, the entire freeway was designated State Route 613 (SR 613) by the Nevada Department of Transportation (NDOT).

Route description

Summerlin Parkway begins at the convergence of a one-way pair near a signalized junction with access ramps to the Las Vegas Beltway (CC 215) and partial access to Far Hills Avenue. The highway becomes a full freeway just east of the intersection and maintains this status as it heads eastward through Summerlin and Las Vegas. It has interchanges with (from west to east) Anasazi Drive, Town Center Drive, Rampart Boulevard, Durango Drive (albeit incomplete), and Buffalo Drive. The freeway terminates at the interchange with Rainbow Boulevard (SR 595) and I-11/US 95, locally known as the "Rainbow Curve" interchange.

History Summerlin Parkway was initially constructed by the developers of Summerlin through the Summerlin Homeowners Association. The first construction along the parkway, completed in 1989, consisted of rebuilding the US 95 interchange and constructing the divided highway west to Town Center Drive. Later projects funded by the Regional Transportation Commission of Southern Nevada brought freeway interchanges to Buffalo Drive in 1992 and Rampart Boulevard in 1994.

By 2000, Summerlin Parkway was built up to expressway standards to a western end at Anasazi Drive. By 2004, the expressway terminated at the Las Vegas Beltway. A half-interchange was added at Durango Drive by 2005, and the Anasazi Drive intersection was converted to an interchange by 2006. Also in 2005, the Nevada Department of Transportation (NDOT) had reconstructed the US 95/Rainbow Boulevard interchange as part of its US 95 widening project (including a new direct connection from eastbound Summerlin Parkway to US 95 north that was not constructed in 1989).

An HOV flyover has been constructed to facilitate HOV movements between Summerlin Parkway and US 95 heading to and from Downtown. The direct connection ramps opened in July 2012, even though Summerlin Parkway does not yet have HOV lanes.

In 2016, the City of Las Vegas installed a median cable barrier system in the median of Summerlin Parkway. The $2-million project ($ in ) was designed to reduce impacts from drivers losing control of vehicles into the landscaped median and prevent crossover collisions.

In early 2017, several operational improvements along Summerlin Parkway were completed. The HOV lanes from US 95 were extended westward from Buffalo Drive to Durango Drive, and new auxiliary lanes were completed westbound to Rampart Boulevard, both directions between Rampart Boulevard and Town Center Drive, and eastbound between the CC 215 interchange and Anasazi Drive.

By January 2019, maintenance responsibility for Summerlin Parkway had been transferred from the City of Las Vegas to NDOT; NDOT designated the freeway as SR 613.

In February 2025, construction began at the interchange of Summerlin Parkway, the Las Vegas Beltway, and Far Hills Avenue. The interchange upgrade project will add a new flyover ramp between CC 215 south and SR 613 east, eliminate most traffic lights, directly connect Far Hills Avenue to CC 215 north, connect Summerlin West to Summerlin Parkway, and add new pedestrian bridges that will connect the Western Beltway Trail to the Bonanza Trail. , the interchange is under construction. It is expected to be finished by 2028.