The Shiraz Metro () is the rapid transit system in Shiraz, Fars, Iran, operated by Shiraz Urban Railway Organization. Construction began in 2001, and service in the first line officially commenced on 11 October 2014.

Lines

The Shiraz Metro is planned to consist of 6 lines. , Lines 1 and 2 are operating, Lines 3 and 4 are under construction, and Lines 5 and 6 are undergoing design and planning.

Line Number Year First Opened Expected Year of Extension Length (km) Total No. of Stations Type Condition 1 2014 2020 22.5 20 Metro Active 2 2023 TBA 12.5 13 Metro Active 3 TBA TBA 10 8 MetroUnder construction 4 TBA TBA TBA TBA MetroUnder construction 5 TBA TBA TBA TBA Metro Design phase 6 TBA TBA TBA TBA Metro Primary design phase Current total 32.5 23

Line 1 Constructions for Line 1 were started in 2001, and the first phase for this line was officially commenced by Vice-president Eshaq Jahangiri on 11 October 2014. The first phase runs for 11 kilometres between Ehsan Sq. in the north-western part of the city and Namazi Sq. in downtown with eight stations in between. Line 1 runs over the ground surface between Mirza-yé Shirazi and Shahed stations. The second phase was recently commenced and service is now operational all the way to Shahid Dastgheyb station on , located just by the city airport in the south-eastern part of the city. This has extended Line 1 to 24.5 kilometres with 19 underground and 1 surface stations in between.

At the southern end of Line 1, two separate tunnels, each with a diameter of , were constructed, with the rest was built as a double track cut-and-cover tunnel. Stations in shallow underground sections have side platforms, while deep-level stations have island platforms.

Shiraz Line 1 stations Name connections Condition OpenedShahid Dastgheyb Active 2017Shahid Doran Active 2017Forsat-e Shirazi Active 2018Janbazan Active 2018Ghadir Active 2018 Razi Active 2017Fazilat Active 2017Kaveh Active 2018Valiasr Active 2017Vakilorroaya Active2020Zandiyeh Active 2015Imam Hossein Active 2019Namazi Active 2014Shahid Avini Active 2017Shahid Motahari Active 2017Qasrodasht Active 2014Shahed Active 2015Mirza-ye Shirazi Active 2015Shari'ati Active 2014Ehsan Active 2014

Line 2 The Line 2 officially opened on 8 February 2023, with 3 stations () as the first phase. It intersects with Line 1 at Imam Hossein Sq. on 31 August of the same year, another station was opened, making the total active stations of this line, 4.

Line 2 runs to Mian Rood and Aadel Abad via Enghelab Street and Basij Square. There are two separate tunnels, each with 7 metre in diameter, at the depth of 15 metres. Among the 13 planned stations, 2 of them will be on the surface.

Shiraz Line 2 stations Name connections Condition OpenedShokoufeh Under construction Ghahramanan Active 2023Adelabad Active 2023Dowlat Active 2024Rahmat Active 2024 Basij Active 2023Esteghlal Active 202615-e Khordad Under construction Imam Hossein Active 2023Azadi Under construction Atlasi Under construction Hafezieh Under construction Sa'adieh Under construction

Line 3 (to Sadra) The eight-station, Line 3 is under construction. First station will start from Mirza-ye Shirazi Metro Station in Line 1 and connects to Sadra, Fars, new city in northwest of Shiraz. Shiraz Line 3 stations Name connections Condition OpenedMirza-ye Shirazi Under construction Milad Under construction Sanaye'e Under construction Dr. Hesabi Under construction Beheshti Under construction Afarinesh Under construction Golestan Under construction Rah Ahan Under construction

Line 4 The Line 4 connects Ehsan to Razi by passing Farhanshahr, Pasdaran, and Esteghlal boulevards. The first phase, connecting Razi to Esteghlal will have 8 stations. Shiraz Line 3- Phase 1 stations Name connections Condition OpenedRazi Under construction Isar Under construction Shahrdari Under construction Zeynabieh Under construction Astaneh Under construction Shahzadeh Ghasem Under construction Darvazeh Kazerun Under construction Esteghlal Under construction

Future Lines Lines 5 and 6 are in the design stage.

Rolling stock Line 1 is being operated using a fleet of 27 five-car 1.5 kV DC overhead electric train-sets which were supplied by the Chinese CNR Corporation and a local partner (IRICO), under a contract awarded in November 2010.

Fares and Tickets

Most of the public transportation fares in urban area in Iran can be paid by smart card or cash/token. The smart card can be used for buses and taxi and sometimes other services and even purchases. The CityWay smart card service is provided by Shar Bank and can be purchased at subway station and automatically recharged. As of summer 2023 Shiraz subway single fare by smart card is 12,000 Rials (1,200 Iranian Toman, ~ US$0.02 as US$ rate is about 49,500 Tomans) or 20,000 Rials (~ US$0.04) for cash purchase. Shiraz City Council in Sept 2023 approved a raise of single fare by smart card to 18,000 Rials and 30,000 Rials for cash purchase.

Time table of Shiraz Metro fares/prices:

2022–2023: Single fares by smart card 12,000 Rials (1,200 Tomans) and by cash/token 20,000 Rials

2021–2022: Single fares by smart card 9,000 Rials (900 Tomans) and by cash/token 15,000 Rials

2018–2019: Single fares by smart card 7,000 Rials (700 Tomans) and by cash/token 10,000 Rials

2017–2018: Single fares by smart card 5,000 Rials (500 Tomans) and by cash/token 6,000 Rials

2014–2015: Single fares 5,000 Rials (500 Tomans- ~ US$0.14 as US$ rate was about 3,500 Tomans) and double fares 8,000 Rials on the first year of work of Shiraz metro.

Network Map

Gallery

See also Rapid transit in Iran

References

External links