The Qinshan Nuclear Power Plant (秦山核电站) is a multi-unit nuclear power plant in Qinshan Town, Haiyan County, in Jiaxing, Zhejiang province, China.

It is the first nuclear power plant in mainland China, with a total capacity of 6.546 million kWh.

Development The construction of the units involved three separate phases.

Phase I Phase I has an annual power generation capacity of 1.7 billion kWh. It involved construction of the small-scale (≈300 MW) Unit-1 only, but was the first domestically designed and constructed nuclear power plant in the nation (95 percent of components came from domestic manufactures).Qinshan Phase 1, 2 and 3 Its preliminary design was completed in October 1983. The first concrete was poured on May 20, 1985, marking the start of full-scale construction. The unit connected to the grid at 00:15 on December 15, 1991. After two years of testing, it reached its designed capacity in December 1993. It entered commercial operation in April 1994 and passed completion acceptance in July 1995.

Phase II The next set of reactors were mid-scale plants (≈600 MW) but still of Chinese design (CNP-600). The steam generators were made by Babcock & Wilcox of Cambridge, Ontario, Canada. Units 1 and 2 of this phase started construction on June 2, 1996 and March 23, 1997, respectively. They were put into commercial operation on April 15, 2002 and May 3, 2004, respectively. Units 3 and 4 started construction on April 28, 2006 and entered operation in 2010 and 2011 respectively.

Phase III Involved construction of two 728 MW (gross) CANDU-6 series of the CANDU reactor design supplied by Atomic Energy of Canada Limited. This was reported to be the largest business venture between Canada and China to that time. In 2001, it was visited by the Canadian Prime Minister Jean Chrétien; both units were online by 2003.

Although Fangjiashan Nuclear Power Plant is technically a separate entity from Qinshan, the World Nuclear Association considers it to essentially be an extension of the Qinshan plant due to their proximity and the fact that the original two reactors built at Fangjiashan were initially intended to be built at Qinshan phase IV (which is no longer planned).

Reactor data + Reactors Unit Type Model Net power(MWe) Gross power(MWe) Thermal power(MWt) Start construction First criticality Grid connection Commercial operation Notes Phase I Qinshan I PWR CNP-300 328(308) 350(330) 966 1985-3-20 1991-10-31 1991-12-15 1994-4-1 Phase II Qinshan II-1 PWR CNP-600 610 650 1930 1996-6-2 2001-11-15 2002-2-6 2002-4-15 Qinshan II-2 PWR CNP-600 668(610) 708(650) 1930 1997-4-1 2004-2-25 2004-3-11 2004-4-3 Qinshan II-3 PWR CNP-600 619 660 1930 2006-4-28 2010-7-13 2010-8-1 2010-10-5 Qinshan II-4 PWR CNP-600 619 660 1930 2007-1-28 2011-11-17 2011-12-25 2011-12-30 Phase III Qinshan III-1 PHWR CANDU 6 677 728 2064 1998-6-8 2002-9-21 2002-11-19 2002-12-31 Qinshan III-2 PHWR CANDU 6 677 728 2064 1998-9-25 2003-1-18 2003-6-12 2003-7-24

In 2019 Qinshan 1 was upgraded and uprated to 350 MWe (net) from its original output power of 300 MWe.

In March 2025, Qinshan II-2 was upgraded to 708MWe (gross) from 650MWe after 20 year's maintanace.

See also

Fangjiashan Nuclear Power Plant List of power stations in China Nuclear power in China