The seventh USS Ranger (CV/CVA-61) was the third of four supercarriers built for the United States Navy in the 1950s. Although all four ships of the class were completed with angled decks, Ranger had the distinction of being the first U.S. carrier built from the beginning as an angled-deck ship.

Commissioned in 1957, she served extensively in the Pacific, especially the Vietnam War, for which she earned 13 battle stars. Near the end of her career, she also served in the Indian Ocean and Persian Gulf.

Ranger was decommissioned in 1993, and was stored at Bremerton, Washington, until March 2015. She was then moved to Brownsville for scrapping, which was completed in November 2017.

Construction and trials Ranger was the first American aircraft carrier to be laid down as an angled-deck ship (her elder sisters Forrestal and Saratoga had been laid down as axial-deck ships and were converted for an angled deck while under construction). She was laid down 2 August 1954 by Newport News Shipbuilding and Drydock Co., Newport News, Virginia in Shipway 10. Her partially completed hull was floated and placed in Shipway 11 four months later for final completion. Ranger was launched 29 September 1956, sponsored by Mrs. Arthur Radford (wife of Admiral Arthur W. Radford, Chairman of the Joint Chiefs of Staff) and commissioned at the Norfolk Naval Shipyard 10 August 1957, Captain Charles T. Booth II in command.

Ranger joined the U.S. Atlantic Fleet on 3 October 1957. Just prior to sailing on 4 October for Guantánamo Bay, Cuba, for shakedown, she received the men and planes of Attack Squadron 85. She conducted air operations, individual ship exercises, and final acceptance trials along the eastern seaboard and in the Caribbean Sea until 20 June 1958. Noted artist Jack Coggins was commissioned by the United States Naval Institute to paint the new aircraft carrier; his artwork appeared on the cover of their Proceedings Magazine of July 1958. She then departed Norfolk, Virginia, with 200 Naval Reserve officer candidates for a two-month cruise that took the carrier around Cape Horn. She arrived at her new homeport, Naval Air Station Alameda, Alameda, California, on 20 August and joined the Pacific Fleet.

Service

The carrier spent the remainder of 1958 in pilot qualification training for Air Group 14 and fleet exercises along the California coast. Departing 3 January 1959 for final training in Hawaiian waters until 17 February, she next sailed as the flagship of Rear Admiral Henry H. Caldwell, Commander, Carrier Division Two, to join the Seventh Fleet. Air operations off Okinawa were followed by maneuvers with SEATO naval units out of Subic Bay, Philippines. A special weapons warfare exercise and a patrol along the southern seaboard of Japan followed. During this first WestPac deployment, Ranger launched more than 7,000 sorties in support of 7th Fleet operations. She returned to San Francisco Bay 27 July. During the next 6 months, Ranger was kept in a high state of readiness through participation in exercises and coastal fleet operations.

With Carrier Air Group 9 embarked, she departed Alameda on 6 February 1960 for a second WestPac deployment and returned to Alameda 30 August. From 11 August 1961 through 8 March 1962, Ranger deployed to the Far East a third time.

The next seven months were filled with intensive training along the western seaboard in preparation for operations in Southeast Asia. Ranger departed Alameda on 9 November for brief operations off Hawaii, thence proceeded, via Okinawa, to the Philippines. She steamed to the South China Sea 1 May 1963 to support possible Laotian operations. When the political situation in Laos relaxed 4 May, she resumed her operations schedule with the 7th Fleet. Arriving at Alameda from the Far East 14 June 1963, she underwent overhaul in the San Francisco Naval Shipyard 7 August 1963 through 10 February 1964. Refresher training out of Alameda commenced 25 March, interrupted by an operational cruise to Hawaii from 19 June to 10 July.

In May 1964, Ranger was deployed near French Polynesia in the Pacific Ocean to monitor the French nuclear tests on Moruroa, a task made possible by launching and recovering a Lockheed U-2 from its flight deck. Work on modifying the U-2 for carrier landing and take-off started in late 1963, and one accident occurred during the carrier landing operation when the aircraft piloted by test pilot Bob Schumacher crashed.

Vietnam War service Ranger again sailed for the Far East on 6 August 1964. This deployment came on the heels of the Gulf of Tonkin incident. Ranger made only an eight-hour stop in Pearl Harbor on 10 August, then hurried on to Subic Bay, then to Yokosuka, Japan. In the latter port on 17 October 1964, she became the flagship of Rear Admiral Miller, who commanded Fast Carrier Task Force 77. In the following months, she helped the 7th Fleet continue its role of steady watchfulness to keep sea lanes open and stop Communist infiltration by sea.

General William Westmoreland, commanding Military Assistance Command, Vietnam, visited Ranger on 9 March 1965 to confer with Rear Admiral Miller. Ranger continued air strikes on enemy targets inland until 13 April when a fuel line broke, ignited and engulfed her No. 1 main machinery room in flames. The fire was extinguished in little over an hour. There was one fatality. She put into Subic Bay 15 April and sailed on the 20th for Alameda, arriving home on 6 May. She entered the San Francisco Naval Shipyard 13 May and remained there under overhaul until 30 September 1965.

Following refresher training, Ranger departed Alameda on 10 December 1965 to rejoin the 7th Fleet. She and her embarked Carrier Air Wing 14 received the Navy Unit Commendation for exceptionally meritorious service during combat operations in Southeast Asia from 10 January to 6 August 1966.

Ranger departed the Gulf of Tonkin on 6 August for Subic Bay, then steamed via Yokosuka for Alameda, arriving on the 25th. She stood out of San Francisco Bay 28 September and entered Puget Sound Naval Shipyard two days later for overhaul. The carrier departed Puget Sound on 30 May 1967 for training out of San Diego and Alameda. On 21 July 1967, she logged her 88,000th carrier landing.

From June until November, Ranger underwent a long and intensive period of training designed to make her fully combat ready. Attack Carrier Air Wing 2 (CVW-2) embarked on 15 September 1967, with the new A-7 Corsair II jet attack plane and the UH-2C Seasprite rescue helicopter, making Ranger the first carrier to deploy with these powerful new aircraft. From carrier refresher training for CVW-2, Ranger proceeded to fleet exercise "Moon Festival". From 9 to 16 October, the carrier and her air wing participated in every aspect of a major fleet combat operation.

Ranger departed Alameda on 4 November 1967 for WestPac. Arriving at Yokosuka on 21 November, she relieved and sailed for the Philippines on the 24th. After arriving at Subic Bay on 29 November, she made final preparations for combat operations in the Gulf of Tonkin. The Commander, Carrier Division 3, embarked on 30 November as Commander, TG 77.7, and Ranger departed Subic Bay on 1 December for Yankee Station.

Arriving on station on 3 December 1967, Ranger commenced another period of sustained combat operations against North Vietnam. During the next five months, her planes hit a wide variety of targets, including ferries, bridges, airfields, and military installations. Truck parks, rail facilities, antiaircraft guns, and SAM sites were also treated to doses of Air Wing 2's firepower. Bob Hope's Christmas Show came to Ranger in the Gulf of Tonkin on 21 December. Another welcome break in the intense pace of operations came with a call at Yokosuka during the first week of April. Returning to Yankee Station on 11 April, Ranger again struck objectives in North Vietnam.

At the end of January 1968, was seized by North Korea. Ranger turned north and proceeded at full speed from the tropical waters off Vietnam to the frigid waters off North Korea as part of Operation Formation Star. The ship had been on the combat line in Vietnam for one month and was due to for rest and recreation. At the conclusion of the North Korea deployment, the ship had been at sea for 65 days. The carrier stopped at the small Japanese port of Sasebo for several days, then proceeded back to combat operations.

After five months of intensive operations, Ranger called at Hong Kong on 5 May 1968 and then steamed for home. There followed a shipyard availability at Puget Sound that ended with Rangers departure 29 July for San Francisco. Three months of leave, upkeep and training culminated in another WestPac deployment 26 October 1968 through 17 May 1969.

She departed Alameda on yet another WestPac deployment in October 1969 as the flagship for Rear Admiral J.C. Donaldson, Commander, Carrier Division Three, and Captain J.P. Moorer as commanding officer,USS Ranger Cruise book 69-70 and remained so employed until 18 May 1970. During this time, the ship spent at least two extended periods on Yankee Station, the longest being 45 days, due to mechanical problems with the carrier that was to relieve her. A pleasant break in the lives of Rangers crew came with the arrival of the Bob Hope show on 24 December 1969. Upon leaving Yankee after one tour and on the way to Sasebo, Ranger was ordered to stand off the coast of Korea for three days due to North Korea forcing down a US C-130 and holding the crew. Initially, Ranger was to leave the line on Yankee Station for a week of R&R in Subic Bay while offloading supplies, then to Japan and on to Australia and home. A day before Ranger was to leave the line she was ordered to hold on station and fly the first sorties on Cambodia. Finally leaving Yankee Station, Ranger made a fast three-day offload in Subic Bay and a two-day port call in Sasebo and back to Alameda, arriving 1 June. Ranger spent the rest of the summer engaged in operations off the west coast, departing for her sixth WestPac cruise in late October 1970. On 10 March 1971, Ranger, along with , set a record of 233 strike sorties for one day in action against North Vietnam. During April, the three carriers assigned to Task Force 77 – Ranger, Kitty Hawk, and – provided a constant two-carrier posture on Yankee Station. Hours of employment remained unchanged, with one carrier on daylight hours and one on the noon to midnight schedule. Strike emphasis was placed on the interdiction of major Laotian entry corridors to South Vietnam. She returned to Alameda 7 June 1971, and remained in port for the rest of 1971 and the first five months of 1972 undergoing regular overhaul.

On 27 May 1972, she returned to West Coast operation until 16 November, when she embarked upon her seventh WestPac deployment. This had been delayed four months when one of the engines was disabled after Navy fireman E-3 Patrick Chenoweth was accused of dropping a heavy paint scraper into a main reduction gear, one of around two dozen acts of sabotage Ranger suffered between 7 June 1972 and 16 October 1972. Chenoweth was charged with "sabotage in time of war", and faced 30 years imprisonment, but was acquitted by a general court-martial.