The Bombardier CRJ100 and CRJ200 (previously Canadair CRJ100 and CRJ200) are regional jets designed and manufactured by Bombardier Aerospace between 1991 and 2006, the first of the Bombardier CRJ family.

The Canadair Regional Jet (CRJ) program, derived from the Challenger 600 business jet, was launched in early 1989. The first CRJ100 prototype made its maiden flight on 10 May 1991. Canada's first jet airliner to enter commercial service was introduced by launch customer Lufthansa in 1992.

The 50 seat aircraft is powered by two GE CF34 turbofans, mounted on the rear fuselage. The CRJ200 has more efficient turbofan engines for lower fuel consumption, increased cruise altitude and speed. During the late 1990s, it was stretched into the CRJ700 series. Production ended in 2006 but many remain in service. In 2020, Mitsubishi Heavy Industries purchased the entire CRJ line from Bombardier, and will continue support for the aircraft.

CRJ100 and CRJ200 are marketing designations defining a CRJ100 of aircraft type CL-600-2B19 with CF34-3A1 engines and a CRJ200 as CL-600-2B19 variant with CF34-3B1 engines.

Some frequent flyers have nicknamed the model the "Devil's Chariot", citing its cramped seating and windows positioned below the average passenger's line of sight.

Development Origins

The CRJ family has its origins in the design of the earlier Canadair Challenger business jet. During the late 1970s, the relatively wide fuselage of the Challenger, which could seat a pair of passengers on each side of a central aisle, was observed by some Canadair officials to suggest that it would be somewhat straightforward to produce a stretch of the aircraft for the purpose of accommodating more seats. Accordingly, in 1980, the company publicised its proposal for an expanded model of the aircraft, designated as the Challenger 610E, which would have had seating for an additional 24 passengers."Canadair Challenger." Flight International, 21 June 1980. p. 1437. However, such a lengthening did not occur as a result of work on the program being terminated during the following year.

Despite the cancellation of the 610E, neither the concept or general interest in the development of an enlarged derivative had disappeared. During 1987, the year following Canadair's sale to Bombardier, design studies commenced into options for producing a substantially more ambitious stretched configuration of the Challenger.Eriksson and Steenhuis 2015, p. 57.

In July 1988, Canadair targeted a $13-14 million unit price, for a demand of over 1,000 by 1999. The 48-seat jet would be stretched over the Challenger by a forward plug and a aft plug. Over routes, the faster climb and cruise gave it a one third time advantage of 50 min compared to similarly sized turboprops. The higher cost per seat of the regional jet, of $270,000 each compared to $186,600, would be balanced by its higher productivity.

During the spring of 1989, these investigations directly led to the formal launch of the Canadair Regional Jet program; it had been decided to retain the "Canadair" name despite the firm's purchase by Bombardier. The program was launched with the aim of selling at least 400 aircraft. SkyWest Airlines, a regional airline was the first US-based customer, placing an order for 10 aircraft in 1989 before the program was officially launched.

The Regional Jet program benefitted from the support of the Canadian government.Roberts 2017, p. 109. Reportedly, the break even point for the type was considered to be relatively low amongst its contemporaries; it has been speculated that the bankruptcy and purchase of Learjet by Bombardier during 1990 had allowed for the development costs of the Challenger to be written off, which in turn had the impact of substantially lowering the cost of the Regional Jet program. In addition, the projected operating costs of the CRJ was lower than some of its turboprop-powered rivals, including the Fokker 50, the ATR-42, and the Bombardier Dash 8.

On 10 May 1991, the first of three development aircraft for the initial CRJ100 variant performed its first flight from Montréal–Pierre Elliott Trudeau International Airport, starting a 1,000h flight test program with three prototypes. During the following year, the type was awarded airworthiness certification; on 29 October 1992, initial deliveries to customers occurred later on that year.Eriksson and Steenhuis 2015, p. 58. On 26 July 1993, the first prototype (C-FCRJ) was lost in a spin mishap near the Bombardier test center in Wichita, Kansas.

Further development

The initial model was followed by the CRJ100 ER subvariant, featuring 20 percent greater range, and the CRJ100 LR subvariant, which possessed 40 percent more range than the standard CRJ100. This sub-variant was developed with the purpose of more closely conforming with the requirements of both corporate and executive operators. A cargo door retrofit has been developed for the installation of former passenger-configured aircraft to extend the useful life of early-built CRJ100s.

The CRJ200, is almost identical to the earlier CRJ100 models, except for the adoption of more efficient GE CF34-3B1 engines; these engines had lower fuel consumption while providing improvements in performance with increased cruise altitude and increased cruise speed. Bombardier had specifically designed the new model to provide better performance and efficiencies than any of its nearest competitors at that time. SkyWest Airlines was the launch customer for the CRJ200, conducting the first revenue flight of the type on February 15, 1994. There would also be a CRJ200 freighter variant, designated as the CRJ200 PF (Package Freighter), which was developed in cooperation with Cascade Aerospace on the request of West Air Sweden.

During 1995, Bombardier embarked on design studies and a detailed market evaluation on the topic of producing a substantially enlarged derivative of the CRJ200. These efforts quickly transitioned into a $450 million program to produce such an aircraft, which was produced as the CRJ700. Many areas of commonality, such as the design of the cockpit, were retained between the CRJ200 and its newer, larger brethren, but various new systems and structures, such as an all-new wing, were incorporated into the design as well.Doyle, Andrew., Emma Kelly, and Paul Lewis. "Regional risk-taking." Flight International, 19 September 2000. Capable of seating up to 70 passengers, the first of these aircraft was delivered during 2001; the CRJ700 was soon joined by the even larger CRJ900 and CRJ1000 models.

On June 1, 2020, the entire Bombardier CRJ regional airliner family was sold to Mitsubishi Heavy Industries (MHI), which plans to continue manufacturing spare parts and providing maintenance support.

Design

The Bombardier CRJ100 and CRJ200 are a family of jet-propelled regional airliners, based upon the design of the Challenger CL-600 business jet. Roughly, the CL-600 was stretched 5.92 metres (19 feet 5 inches), which was achieved using fuselage plugs fore and aft of the wing, and was matched with the adoption of a reinforced and modified wing, an expanded fuel capacity, improved landing gear to handle the higher weights, and an additional pair of emergency exit doors. When installed in a typical seating configuration, the CRJ100 would accommodate 50 passengers; while in a maximum configuration, 52 passengers could be accommodated. It was powered by a pair of General Electric CF34-3A1 turbofan engines, each of which was capable of generating up to 41 kN (9,220 lbf) of thrust. The CRJ100 featured a Collins-built ProLine 4 avionics suite, including a weather radar. It is built as a low-wing monoplane with a T-tail empennage and a semi-monocoque fuselage largely derived from the Canadair Challenger business jet, but stretched by roughly 5.9 m via fuselage plugs before and after the wing to accommodate ~50 passengers. The wing was re-designed for high-subsonic cruise: a transonic planform with sweep and preserved winglets help reduce drag at regional-jet cruise speeds.

Operational history

German airline Lufthansa CityLine, a subsidiary of the nation's flag carrier operator Lufthansa, served as the launch customer for the CRJ100. Throughout the type's production life, it continued to be a major customer of the CRJ series. During 2001, following Lufthansa's acquisition of 25 per cent of regional airliner Eurowings, the airline ordered 15 CRJ200s with options for 30 more as part of a strategic move towards fleet commonality with Lufthansa Skyline."Eurowings to land Bombardier regionals." Flight International, 8 May 2001.

During the airliner's first 100 days of operational service, the CRJ100 performed a total of 1,237 flights, during which it reportedly achieved a 99% dispatch reliability while its fuel economy was reportedly 8% superior to the originally projected figure. According to aviation author Dean Roberts, the CRJ100 had benefitted greatly from an industry-wide shift towards hub-and-spoke networks in the United States, which had resulted from the Airline Deregulation Act of 1978. Considerable demand across the North American market was experienced by both the CRJ100 and the CRJ200. The smaller size of the regional jets meant than, unlike traditional narrowbody jets, they could be used at the majority of secondary airports and avoid traditional hubs.Vasigh, Taleghani and Jenkins 2012, p. 90.

Soon after the entry to service of the longer range CRJ200, the model proved to be a commercial success as well. According to aerospace publication Flight International, 1999 was a record year in terms of aircraft deliveries by Bombardier.Martin, Mark. "Bombardier forges ahead in Asia-Pacific." Flight International, 23 February 2000. Writing around this time, authors Bijan Vasigh, Reza Taleghani, and Darryl Jenkins declared that "the CRJ program [is] one of the most successful regional aircraft programs in the world". By the end of 2000, perhaps the most significant operators of the CRJ100 included the American airline Comair, German short-haul operator Lufthansa Cityline, and French regional airline Brit Air; of its CRJ200 sibling, key operators by this time included Delta Connection, SkyWest Airlines, and Independence Air.Vasigh, Taleghani and Jenkins 2012, p. 88.

During early 1999, Bombardier announced the biggest ever order in the company's history; issued by Northwest Airlines, it involved a firm order for 54 CRJ200LRs along with options for a further 70 aircraft for $1.3 billion. In response to customer demand, the company stated that it was to increase production at its Montreal assembly line from 75 to 90 aircraft per year before the end of the year.Lewis, Paul. "Bombardier increases production." Flight International, 24 February 1999. By 2001, a total of 516 airliners were reportedly on order, of which 272 had been delivered. To address the backlog of nearly 250 aircraft, Bombardier worked to increase the rate of production from 9.5 regional jets per month to 12.5 regional jets. The boom in regional jets did not exclusively benefit the CRJ series; simultaneously, Brazilian manufacturer and rival firm Embraer also worked to increase their output of regional jets.Hecker and Martin 2001, p. 47.