The is a railway line in Japan, operated by Kyushu Railway Company (JR Kyushu). It connects Jōno Station in Kitakyushu, Fukuoka Prefecture with Soeda Station in Soeda, Fukuoka Prefecture.
Prior to 5 July 2017, the line continued from Soeda Station to Yoake Station in Hita, Ōita Prefecture. This section of the line features the Shakadake Tunnel between Chikuzen Iwaya and Hikosan station, where a fatal tunnel collapse occurred during construction in 1953, killing 21 construction workers. The line is named after Hita and Mount Hiko.
On 5 July 2017, torrential rainfall from Severe Tropical Storm Nanmadol (also known as Typhoon No. 3) resulted in the closure of the section of the line between Soeda and Yoake. The damage was severe and included the destruction of several bridges and parts of the track being washed away.
On 16 July 2020, JR Kyushu formally announced plans to permanently replace the section of railway line with a bus rapid transit (BRT) service. The BRT route, operated by JR Kyushu Bus Company, opened on 28 August 2020 under the name [ja] (also referred to as Hita Hikosan Line BRT).
Stations ●: Stops, |: non-stop No.StationDistance(km)RapidTransfersLocation Nippō Main Line小倉Kokurakita-ku, Kitakyūshū西小倉南小倉 Hitahikosan LineJōno 城野0.0● Nippō Main LineKokuraminami-ku, KitakyūshūFukuoka PrefectureIshida 石田3.3| Shii-Kōen 志井公園5.1| (Kikugaoka Station) - 400m awayShii 志井6.8| Ishiharamachi 石原町9.0● Yobuno 呼野12.3| Saidōsho 採銅所18.1| Kawara Kawara 香春23.4● Ipponmatsu 一本松25.0| Tagawa-Ita 田川伊田27.4● Heisei Chikuhō Railway: Ita Line Tagawa LineTagawaTagawa-Gotōji 田川後藤寺30.0● Gotōji Line Heisei Chikuhō Railway: Itoda LineIkejiri 池尻32.2| KawasakiBuzen-Kawasaki 豊前川崎34.7● Nishi-Soeda 西添田38.3| SoedaSoeda 添田39.5●Hikoboshi BRT[ja]
Stations closed after 5 July 2017 StationDistance(km)RapidTransfersLocationKanyūsha-Hikosan 歓遊舎ひこさん41.6 SoedaFukuoka PrefectureBuzen-Masuda 豊前桝田43.2 Hikosan 彦山47.2 Chikuzen-Iwaya 筑前岩屋55.1 TōhōDaigyōji 大行司59.3 Hōshuyama 宝珠山61.3 Ōtsuru 大鶴62.9 HitaŌita PrefectureImayama 今山65.4 Yoake 夜明68.7 Kyūdai Main Line
Rolling stock
KiHa 40 series 2-car DMU
Photo gallery
History On 1 April 1960, the Hitahikosan Line was formed by a merger of the following lines: Main line Jōno – Kawara and Soeda – Yoake sections of the Hita Line (the remaining Kawara – Soeda section became the Soeda Line) Kawara – Ita branch of the Hita Line Ita – Soeda section of the Tagawa Line (the Yukuhashi – Kawara section remained as the Tagawa Line) Branches Ishida – freight branch of the Hita Line Buszen-Kawasaki – Daiichi-Ōtō freight branch of the Tagawa Line Buszen-Kawasaki – Daini-Ōtō freight branch of the Tagawa Line
All the branches were abolished in 1962, 1974 and 1970 respectively. In 1987, the Japanese National Railways was privatized and the line was succeeded by JR Kyushu.
Construction The Hōshū Railway opened the Tagawa-Ita - Buzen Kawasaki section as part of the Tagawa Line in 1899. That company merged with the Kyushu Railway Company in 1901, which extended the line to Soeda in 1903. The company was nationalised in 1907.
The Jono - Tagawa-Ita section was opened in 1915 by the Kokura Railway Co., that company being nationalised in 1943. The Soeda - Daigyoji section opened between 1937 and 1946, and the Daigyoji - Yoake section opened in 1956.
CTC signalling was introduced on the entire line in 1984. Freight service ceased beyond Tagawa-Gotōji in 1986, and totally in 1999.
Typhoon damage On 5 July 2017, torrential rainfall from Severe Tropical Storm Nanmadol (also known as Typhoon No. 3) resulted in the closure of the section of the line between Soeda and Yoake. The damage was severe and included the destruction of several bridges and parts of the track being washed away. The line remained disconnected as of the start of 2020. On 12 February 2020, it was proposed by JR Kyushu to not restore the rail service, due to low passenger use and high maintenance costs, and permanently replace it with bus rapid transit (BRT). On 16 July, JR Kyushu formally announced plans to convert this section of the line to a BRT service.
The BRT route opened on 28 August 2020 under the name BRT Hikoboshi Line[ja]. With the opening of the line, the number of stations along the route increased from 12 to 36, although travel times roughly doubled. Following the partial conversion of JR East's Ōfunato Line and Kesennuma Line in the Tōhoku region, the line is Japan's third rail service to be converted to BRT.
Former connecting lines Buzen Kawasaki Station: The 26 km Kamiyamada Line opened from Iizuka (on the Chikuho Main Line) to Shimoyamada in 1898, extended to Kamiyamada in 1929 and to Buzen Kawasaki (as a passenger-only section) in 1966. Freight services ceased in 1980, and the line closed in 1988. This line had two connections: A 2 km gauge line from Okuma (16 km from Buzen Kawasaki) - Okumamachi operated between 1924 and 1933. The 8 km Urushio line from Shimokamoo (14 km from Buzen Kawasaki) - Shimayamada (connecting to the Gotoji Line) opened in 1943, and closed in 1986.
Soeda station - The Kokura Railway Co. opened a line to Ipponmatsu in 1915. The line was nationalised in 1943 and closed in 1985.
References This article incorporates material from the corresponding article in the Japanese Wikipedia.